Permit authority

City of Valley Building and Zoning Department

Street address
203 N Spruce Street, Valley, NE 68064
Coverage
All properties within the incorporated limits of the City of Valley (a second-class city in Douglas County). Valley administers its own building permit program independently through a local Building and Zoning Department.
Online portal
SmartGov Community
SmartGov Community
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Valley

Required per adopted codes for new construction, additions, structural alterations, electrical, plumbing, mechanical, and regulated construction work.

Note: Not published as a standalone list. Under adopted 2012 IBC/IRC, common exemptions generally include painting, papering, tiling, flooring, cabinet work, and similar finish work. Confirm specific exemptions with Valley Building and Zoning Department at (402) 359-2251.

Required documents
  • Completed permit application
  • Construction plans and drawings
  • Site plan
Building code
2012 International Building Code (IBC); 2012 International Residential Code (IRC); 2012 International Mechanical Code; 2012 International Plumbing Code; 2023 National Electrical Code (NEC); 2009 International Energy Conservation Code; 2012 International Property Maintenance Code.
Permit validity
Work must begin within six months of permit issuance and be substantially completed within two years. Per IBC Section 108, permit fees are doubled if work starts before permit is issued.
Owner-builder
Not specifically published. Contact Building Inspector at buildinginspector@valleyne.org.
Contractor requirements
Not specifically published. Contact Building Inspector at (402) 359-2251.
§ 03

Application process

Typical processing: Not published. Contact (402) 359-2251 for current timeline.

  1. 01
    Determine whether a permit is required for the project.
  2. 02
    Apply online via https://ci-valley-ne.smartgovcommunity.com/Public/Home or obtain paper application at City Hall (203 N Spruce Street).
  3. 03
    Complete application with project description, location, and contractor information.
  4. 04
    Submit required plans and documentation.
  5. 05
    Building and Zoning Department reviews application.
  6. 06
    Receive approval or request for additional information.
  7. 07
    Pay permit fees.
  8. 08
    Permit issued; post on job site.
  9. 09
    Schedule required inspections through portal or by calling (402) 359-2251.
  10. 10
    Pass all required inspections; final approval issued.

Typical processing time: Not published. Contact (402) 359-2251 for current timeline.

Source: City of Valley Building and Zoning Department ↗

§ 04

Fee schedule

Valley building permit fees

Fee type
Amount
01
Penalty (no permit)
Per IBC Section 108, fees doubled for work started without a permit.

Contact Building and Zoning Department for payment options.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Contact Building Department at (402) 359-2251 for inspection scheduling windows.

Typical sequence: Standard IBC/IRC sequence -- foundation, framing, rough-in (electrical, plumbing, mechanical), insulation, final.

§ 06

Frequently asked

Common questions about Valley permits

01 Do I need a building permit in Valley, NE?
Required per adopted codes for new construction, additions, structural alterations, electrical, plumbing, mechanical, and regulated construction work.
02 How do I apply for a building permit in Valley, NE?
To apply for a building permit in Valley, NE, follow these steps: 1. Determine whether a permit is required for the project. 2. Apply online via https://ci-valley-ne.smartgovcommunity.com/Public/Home or obtain paper application at City Hall (203 N Spruce Street). 3. Complete application with project description, location, and contractor information. 4. Submit required plans and documentation. 5. Building and Zoning Department reviews application. 6. Receive approval or request for additional information. 7. Pay permit fees. 8. Permit issued; post on job site. 9. Schedule required inspections through portal or by calling (402) 359-2251. 10. Pass all required inspections; final approval issued.
03 How long does it take to get a building permit in Valley, NE?
Building permit processing times in Valley, NE typically run Not published. Contact (402) 359-2251 for current timeline.. Timelines can vary based on project complexity and current department workload.
04 How do I schedule a building inspection in Valley, NE?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Valley, NE via: SmartGov portal, (402) 359-2251.
last verified April 2026 source City of Valley Building and Zoning Department ↗ entry id permits/nebraska/douglas/valley

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Valley Building and Zoning Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Douglas County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Douglas County jurisdictions →