§ 01

Permit authority

City of Conrad Building Department

Street address
413 South Main Street, Conrad, MT 59425-2337
Coverage
Conrad is the county seat and only fully incorporated city with its own building department. Conrad enforces local building codes and has certified jurisdiction under Montana state law.
Online portal
City of Conrad Building Permits
Local city portal
§ 02

When a permit is required

Permit triggers and exempt work for Conrad

Building permits required for any construction including new homes and structures, additions and alterations, decks, patios, sidewalks, siding and roof replacements, storage sheds and garages, fences, and any structural work.

Note: Contact City Building Department for Conrad's exemption list. State general exemptions likely apply but may be modified locally.

Required documents
  • Complete construction plans and drawings
  • Site plan showing property lines and setbacks
  • Building valuation estimate
  • Proof of property ownership or authorization
  • Architectural seals if required by Conrad municipal code
  • Engineering reports (as required)
  • Any locally-specific forms required by Conrad
Building code
Conrad has adopted Title 10 Building Regulations with Chapter 1 Building Code ordinance (current through Ordinance 203, passed 5-12-2025). Likely based on International Building Code 2021 per state standard.
§ 03

Application process

Typical processing: 1-2 weeks typical processing

  1. 01
    Obtain permit application form from City Building Department
  2. 02
    Prepare complete construction documents (architectural plans, site plans, engineering as required)
  3. 03
    Complete application with accurate project valuation
  4. 04
    Submit application and documents to Building Department at City Hall or by mail
  5. 05
    Building Inspector reviews for code compliance (typically 1-2 weeks)
  6. 06
    If approved, building permit issued; if revisions needed, applicant resubmits
  7. 07
    Permit must be approved before construction begins
  8. 08
    Schedule required inspections with Building Inspector
  9. 09
    Upon final inspection approval, permit is closed

Typical processing time: 1-2 weeks typical processing

Source: City of Conrad Building Department ↗

§ 04

Fee schedule

Conrad building permit fees

Fee type
Amount
01
Permit fee formula
General Montana standard is 1-2% of building valuation, plus plan review fees. Conrad may have adopted similar structure or local modifications.

Contact City Building Department at (406) 271-5821 for current fee schedule and specific amounts

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Contact Building Inspector Keith Thaut at (406) 271-5821 (phone)
Inspection hours
7:00 AM - 3:30 PM, Monday-Friday

Typical sequence: Typical inspections: foundation/footing, framing, plumbing, electrical, final. Work must not proceed past inspection stage until approved. All inspections must be complete before occupancy.

§ 06

Frequently asked

Common questions about Conrad permits

01 Do I need a building permit in Conrad, MT?
Building permits required for any construction including new homes and structures, additions and alterations, decks, patios, sidewalks, siding and roof replacements, storage sheds and garages, fences, and any structural work.
02 How much does a building permit cost in Conrad, MT?
Building permit fees in Conrad, MT are set by the local building department and vary by project type and valuation. Fees are calculated as: General Montana standard is 1-2% of building valuation, plus plan review fees. Conrad may have adopted similar structure or local modifications..
03 How do I apply for a building permit in Conrad, MT?
To apply for a building permit in Conrad, MT, follow these steps: 1. Obtain permit application form from City Building Department 2. Prepare complete construction documents (architectural plans, site plans, engineering as required) 3. Complete application with accurate project valuation 4. Submit application and documents to Building Department at City Hall or by mail 5. Building Inspector reviews for code compliance (typically 1-2 weeks) 6. If approved, building permit issued; if revisions needed, applicant resubmits 7. Permit must be approved before construction begins 8. Schedule required inspections with Building Inspector 9. Upon final inspection approval, permit is closed
04 How long does it take to get a building permit in Conrad, MT?
Building permit processing times in Conrad, MT typically run 1-2 weeks typical processing. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Conrad, MT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Conrad, MT via: Contact Building Inspector Keith Thaut at (406) 271-5821.
last verified March 2026 source City of Conrad Building Department ↗ entry id permits/montana/pondera/conrad

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Conrad Building Department before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Pondera County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Pondera County jurisdictions →