jaspector
City building permits

Lee's Summit

How to apply for a building permit in Lee's Summit, Missouri. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Lee's Summit Development Services Department

Street address
220 SE Green St, Lee's Summit, MO 64063
Coverage
Applies within the City of Lee's Summit
Online portal
https://devservices.cityofls.net/
CityView Portal
§ 02

When a permit is required

Permit triggers and exempt work for Lee's Summit

City states permits are required for commercial buildings and remodels, as well as many residential repairs, additions, and remodels

City does not publish a single simplified exemption list on the reviewed pages
Verify project-specific exemptions with Development Services before relying on them
  • Exempt City does not publish a single simplified exemption list on the reviewed pages
  • Exempt Verify project-specific exemptions with Development Services before relying on them
Required documents
  • When a permit is required: City states permits are required for commercial buildings and remodels, as well as many residential repairs, additions, and remodels
  • Required documents: Project-specific plans and forms; commercial projects require digital sealed plan sets where applicable
  • Permit validity/expiration: Temporary certificates of occupancy are issued for 30 days; broader permit expiration rules depend on code and permit type
  • Owner-builder rules if available: Roofing permits can be obtained by a licensed contractor or by the homeowner when it is the homeowner's primary residence
  • Contractor license requirements: All contractors doing work within the city must be licensed by Lee's Summit
  • Building code adopted: City materials reference 2018 building, mechanical, plumbing, fuel gas, and fire codes, 2017 NEC, and ICC A117.1-2009 as amended
Building code
City materials reference 2018 building, mechanical, plumbing, fuel gas, and fire codes, 2017 NEC, and ICC A117.1-2009 as amended
Permit validity
Temporary certificates of occupancy are issued for 30 days; broader permit expiration rules depend on code and permit type
Owner-builder
Roofing permits can be obtained by a licensed contractor or by the homeowner when it is the homeowner's primary residence
Contractor requirements
All contractors doing work within the city must be licensed by Lee's Summit
§ 03

Application process

Typical processing: Move permits are generally processed within 5 working days; other permit timelines vary by permit type and completeness

  1. 01
    Start with Development Services and confirm the applicable permit path for residential, commercial, roofing, demolition, or miscellaneous work
  2. 02
    Ensure the contractor holds the required Lee's Summit city license, or confirm homeowner eligibility if owner-occupant
  3. 03
    Submit the permit application and required plans through the CityView portal or Development Services counter
  4. 04
    City staff performs permit and plan review; commercial building permits do not have a separate application or plan review fee
  5. 05
    Pay the assessed fees online or over the counter
  6. 06
    Receive the permit and keep it posted / available on site
  7. 07
    Schedule inspections through CityView and complete final approval or certificate of occupancy steps

Typical processing time: Move permits are generally processed within 5 working days; other permit timelines vary by permit type and completeness

Source: City of Lee's Summit Development Services Department ↗

§ 04

Fee schedule

Lee's Summit building permit fees

Fee type
Amount
01
Minimum permit fee
Roofing and demolition permits are flat $50 permits; other permits vary
02
Plan check fee
City states there is no separate application or plan review fee for commercial building permits
03
Permit fee formula
Building permit fees are based on project cost and work type, except flat-fee categories like re-roof and demolition
04
Reinspection fee
Temporary certificate of occupancy extensions require payment under the adopted fee schedule

Payments can be made online using check or credit card, or over the counter using check, cash, or credit card

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • CityView portal; phone support through Development Services ()
Inspection hours
Department hours Monday-Friday 8:00 am to 5:00 pm; field engineering asks for at least 2 business days notice for site development and subdivision permits

Typical sequence: Routine and required inspections follow the issued building permit; special sequences are posted for site development, sanitary sewer, and third-party residential inspections

§ 06

Frequently asked

Common questions about Lee's Summit permits

01 Do I need a building permit in Lee's Summit, MO?
City states permits are required for commercial buildings and remodels, as well as many residential repairs, additions, and remodels
02 How much does a building permit cost in Lee's Summit, MO?
Building permit fees in Lee's Summit, MO are set by the local building department and vary by project type and valuation. The minimum permit fee is Roofing and demolition permits are flat $50 permits; other permits vary. Fees are calculated as: Building permit fees are based on project cost and work type, except flat-fee categories like re-roof and demolition. Plan check fee: City states there is no separate application or plan review fee for commercial building permits.
03 How do I apply for a building permit in Lee's Summit, MO?
To apply for a building permit in Lee's Summit, MO, follow these steps: 1. Start with Development Services and confirm the applicable permit path for residential, commercial, roofing, demolition, or miscellaneous work 2. Ensure the contractor holds the required Lee's Summit city license, or confirm homeowner eligibility if owner-occupant 3. Submit the permit application and required plans through the CityView portal or Development Services counter 4. City staff performs permit and plan review; commercial building permits do not have a separate application or plan review fee 5. Pay the assessed fees online or over the counter 6. Receive the permit and keep it posted / available on site 7. Schedule inspections through CityView and complete final approval or certificate of occupancy steps
04 How long does it take to get a building permit in Lee's Summit, MO?
Building permit processing times in Lee's Summit, MO typically run Move permits are generally processed within 5 working days; other permit timelines vary by permit type and completeness. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Lee's Summit, MO?
Not all construction work requires a permit in Lee's Summit, MO. The following work is generally exempt: City does not publish a single simplified exemption list on the reviewed pages; Verify project-specific exemptions with Development Services before relying on them. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Lee's Summit, MO?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Lee's Summit, MO via: CityView portal; phone support through Development Services.
last verified April 2026 source City of Lee's Summit Development Services Department ↗ entry id permits/missouri/jackson/lee-s-summit

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Lee's Summit Development Services Department before applying. Jaspector is not legal advice.