How to apply for a building permit in Town of Taylorsville, Mississippi. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Taylorsville Town Hall

Street address
125 Eaton Street, Taylorsville, MS 39168
Coverage
All properties within the incorporated limits of the Town of Taylorsville. Taylorsville is the largest incorporated town in Smith County and a Mississippi Main Street Community.
§ 02

When a permit is required

Permit triggers and exempt work for Taylorsville

New residential construction, new commercial or industrial construction, structural additions or alterations, change of use or occupancy, and major structural remodeling.

Note: Confirm all exemptions with Town Hall before proceeding. Downtown commercial projects may be subject to additional design review as Taylorsville is a Mississippi Main Street Community.

Required documents
  • Completed building permit application
  • Two (2) sets of construction plans: site/plot plan, foundation and footing details, framing details, electrical layout, and elevations (front, side, rear)
  • Proof of property ownership
  • MSDH Form 335 (if not on public sewer)
Building code
Taylorsville must adopt one of the last three editions of the IBC or IRC as a minimum code per Mississippi law. The statewide baseline is 2021 IBC / 2021 IRC with Mississippi amendments (effective July 1, 2024). Confirm specific adopted edition with Town Hall.
Contractor requirements
Contractors must hold a valid MSBOC license for projects $50,000 or more (residential new construction) or $10,000+ (residential remodeling/roofing). Contact MSBOC at 800-880-6161 or https://www.msboc.us/
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Contact Taylorsville Town Hall at 601-785-6531 (M–F, 8:00 a.m. – 5:00 p.m.).
  2. 02
    Confirm permit requirements for the specific project.
  3. 03
    Obtain building permit application form from Town Hall.
  4. 04
    Prepare two (2) sets of construction plans.
  5. 05
    Obtain MSDH Form 335 septic evaluation from Smith County Health Department (601-782-4472) if not on public sewer.
  6. 06
    Submit completed application, plans, and supporting documentation.
  7. 07
    Pay applicable permit fees.
  8. 08
    Obtain permit and begin construction.
  9. 09
    Schedule required inspections.
  10. 10
    Obtain final inspection approval before occupancy.
§ 04

Required inspections

Scheduling and sequence

How to schedule
  • Town Hall (phone)
Inspection hours
Monday–Friday, 8:00 a.m. – 5:00 p.m.

Typical sequence: Standard inspection stages for residential construction: 1) Foundation/footing inspection, 2) Framing inspection, 3) Electrical rough-in inspection, 4) Plumbing rough-in inspection (if applicable), 5) HVAC inspection (if applicable), 6) Final inspection before occupancy. Confirm inspection scheduling and stages with Town Hall at permit issuance. Septic inspection by MSDH or Smith County Health Department required separately for properties not on public sewer.

§ 05

Frequently asked

Common questions about Taylorsville permits

01 Do I need a building permit in Taylorsville, MS?
New residential construction, new commercial or industrial construction, structural additions or alterations, change of use or occupancy, and major structural remodeling.
02 How do I apply for a building permit in Taylorsville, MS?
To apply for a building permit in Taylorsville, MS, follow these steps: 1. Contact Taylorsville Town Hall at 601-785-6531 (M–F, 8:00 a.m. – 5:00 p.m.). 2. Confirm permit requirements for the specific project. 3. Obtain building permit application form from Town Hall. 4. Prepare two (2) sets of construction plans. 5. Obtain MSDH Form 335 septic evaluation from Smith County Health Department (601-782-4472) if not on public sewer. 6. Submit completed application, plans, and supporting documentation. 7. Pay applicable permit fees. 8. Obtain permit and begin construction. 9. Schedule required inspections. 10. Obtain final inspection approval before occupancy.
03 How do I schedule a building inspection in Taylorsville, MS?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Taylorsville, MS via: Town Hall.
last verified April 2026 entry id permits/mississippi/smith/taylorsville

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Taylorsville Town Hall before applying. Jaspector is not legal advice.