When a permit is required
Permit triggers and exempt work for Pearl River Valley Water Supply District (The Rez)
New construction (residential and commercial), shoreline protection, boat houses, piers, repairs, additions, renovations, driveways, demolition, electrical/mechanical/plumbing upgrades, roofing, fencing, foundation repair, mobile homes, temporary structures (PODs), pools, and signs; rental property licenses are also required for rental units
Note: Not published as a standalone list; the broad range of required permit types (including roofing, fencing, and garage sales) suggests a narrow exemption list; confirm with 769-243-7014
- Current PRVWSD builder/contractor license and registration
- Sub-contractor licenses (plumbing, mechanical, electrical)
- Three plan sets with PDF copies (residential: architectural elevations, foundation plans, utility layouts; commercial: plot plans, drainage, erosion control, engineer-stamped foundation plans)
- HOA/ARC approval if applicable
- Engineer-stamped drawings for foundation repairs showing repair locations
- Site plan showing location of proposed building
- Building code
- 2015 International Building Code (IBC), 2015 International Residential Code (IRC), 2015 International Plumbing Code (IPC), and related 2015 I-Codes adopted as of March 2016
- Contractor requirements
- Builder/contractor must be currently licensed and registered with PRVWSD; all sub-contractors must also hold current licenses
Application process
Application → plan check → issuance → inspection → final
- 01 For residential projects: Obtain HOA/ARC approval if the property falls within an HOA.
- 02 Ensure builder/contractor holds current PRVWSD license and registration.
- 03 Prepare three plan sets (plus PDF copies), including architectural elevations, foundation plans, and utility layouts.
- 04 Submit application through the online permit portal or in person at 6018 Lakeshore Park.
- 05 Application is reviewed by PRVWSD staff.
- 06 Permit is issued upon approval.
- 07 Schedule inspections through the Building Department.
- 08 For commercial projects: Obtain board/committee approval before applying. Prepare three plan sets, plot plans, drainage details, erosion control measures, and engineering-stamped foundation plans. Submit application as above.
Fee schedule
Pearl River Valley Water Supply District (The Rez) building permit fees
Contact 769-243-7014 for payment instructions
Required inspections
Scheduling and sequence
- 769-243-7014 (phone)
- buildingdepartment@therez.ms (email)
- Inspection hours
- Standard district office hours; confirm with department
Typical sequence: The department performs inspections on rental units and construction projects throughout the permitting process; specific sequence not published
Frequently asked
Common questions about Pearl River Valley Water Supply District (The Rez) permits
01 Do I need a building permit in Pearl River Valley Water Supply District (The Rez), MS? ▸
02 How much does a building permit cost in Pearl River Valley Water Supply District (The Rez), MS? ▸
03 How do I apply for a building permit in Pearl River Valley Water Supply District (The Rez), MS? ▸
04 How do I schedule a building inspection in Pearl River Valley Water Supply District (The Rez), MS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with PRVWSD Building and Permitting Department before applying. Jaspector is not legal advice.