When a permit is required
Permit triggers and exempt work for Marks
A building permit is required for new construction of residential or commercial structures, additions and alterations beyond minor repairs, electrical/plumbing/mechanical/gas system work, manufactured/mobile home placement, demolition, and sign installations.
- Exempt Purely cosmetic work (painting, flooring, minor repairs) generally exempt from permit requirements.
Note: Exemptions from building permits do not mean exemption from zoning and planning requirements. Confirm edge cases with City Hall before proceeding.
- Completed permit application
- Project plans and specifications
- Proof of ownership or authorization
- Building code
- Marks, as an incorporated municipality, has authority to adopt building codes under Mississippi Code Title 17, Chapter 2. The specific edition of the IBC and IRC currently adopted should be verified directly with City Hall. Confirm current standards.
Application process
Typical processing: Processing time varies; contact City Hall for estimates on specific projects.
- 01 Visit or contact City Hall at 340 Pecan Street, Marks, MS 38646, phone (662) 326-3161, during business hours (Monday–Friday, 8:00 AM – 4:30 PM).
- 02 Obtain the appropriate permit application form (residential, commercial, electrical, plumbing, mechanical).
- 03 Complete the application with project plans and specifications.
- 04 Submit application with required documentation to City Hall.
- 05 Pay applicable permit fees.
- 06 Building official or city staff reviews and approves the application.
- 07 Permit is issued; schedule required inspections.
- 08 Final inspection and Certificate of Occupancy issued upon approval.
Typical processing time: Processing time varies; contact City Hall for estimates on specific projects.
Required inspections
Scheduling and sequence
- (662) 326-3161 (phone)
- City Hall at 340 Pecan Street, Marks, MS 38646 (in-person)
- Inspection hours
- Monday–Friday, 8:00 AM – 4:30 PM
Typical sequence: Standard construction inspection stages: foundation inspection, framing inspection, electrical rough-in inspection, plumbing rough-in inspection, mechanical/HVAC inspection, and final inspection with Certificate of Occupancy.
Frequently asked
Common questions about Marks permits
01 Do I need a building permit in Marks, MS? ▸
02 How do I apply for a building permit in Marks, MS? ▸
03 How long does it take to get a building permit in Marks, MS? ▸
04 What work is exempt from building permits in Marks, MS? ▸
05 How do I schedule a building inspection in Marks, MS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City Hall before applying. Jaspector is not legal advice.