On this page 6
When a permit is required
Permit triggers and exempt work for Ridgeland
Building permits are required for new construction, additions, renovations, commercial tenant improvements, and other work regulated by adopted codes. Rental properties require an inspection before occupancy. New businesses require a privilege license inspection.
- Exempt Ordinary maintenance and repair
- Exempt Painting and decoration
- Exempt Flooring
- Exempt Cabinet and countertop replacement
- Exempt Minor non-structural repairs
Note: No specific exemption list is published on the division's public pages. Standard exemptions under the adopted I-Codes are typical. Confirm with (601) 856-7113 for your specific project.
- Building Permit Application (PDF)
- Construction drawing package
- Site plan
- ARB checklist for commercial projects
- Contractor licensing application
- Subcontractor licensing application
- Utility inspection application as needed
- Building code
- Ridgeland enforces the 2015 International Code family (International Building Code, International Residential Code, International Mechanical Code, International Plumbing Code, International Fire Code, International Energy Conservation Code, International Property Maintenance Code) and the 2005 National Electric Code. A 2021 Building Code adoption document is referenced, suggesting the city may have updated to the 2021 I-Codes. Confirm current edition with (601) 856-7113.
- Permit validity
- Not publicly stated; confirm with the division.
- Owner-builder
- Not specified on public-facing pages; contact (601) 856-7113.
- Contractor requirements
- General Contractor Licensing Application Packet and Sub Contractor Licensing Application Packet available on city website. Mississippi State Board of Contractors licensing required for residential over $50,000 and commercial over $100,000. City maintains its own contractor licensing requirement; applicants must register with the city.
Source: City of Ridgeland -- Building Permits and Inspections Division ↗
Application process
Typical processing: Not publicly stated; contact (601) 856-7113 for current estimates.
- 01 Review the permit types and requirements.
- 02 For commercial projects: obtain Mayor and Board of Aldermen approval through the Architectural Review Board (ARB) process before plan review. Use the ARB Checklist.
- 03 Download the Building Permit Application (PDF) from the city website.
- 04 Prepare required documents: construction drawing package; site plan (use Site Plan Review Checklist); contractor license; subcontractor license applications as needed.
- 05 Submit online via MGO Connect or in person at 100 W School Street.
- 06 Building official reviews plans for compliance with adopted codes.
- 07 Pay permit fees.
- 08 Permit is issued.
- 09 Schedule required inspections at construction milestones.
- 10 Obtain Certificate of Occupancy upon passing final inspection.
Typical processing time: Not publicly stated; contact (601) 856-7113 for current estimates.
Source: City of Ridgeland -- Building Permits and Inspections Division ↗
Fee schedule
Ridgeland building permit fees
Fees paid through the MGO Connect portal (online) or in person at City Hall; contact for accepted methods.
Required inspections
Scheduling and sequence
- (601) 856-7113 (phone)
- MGO Connect Portal (online)
- Inspection hours
- Monday through Friday 8:00 AM to 5:00 PM (typical hours; contact division to confirm inspector availability windows).
Typical sequence: New building inspections, privilege license inspections for new businesses, rental property inspections before occupancy. Standard sequence includes foundation, rough trades (plumbing, framing, electrical), insulation, and final. Confirm required inspections at permit issuance.
Source: City of Ridgeland -- Building Permits and Inspections Division ↗
Frequently asked
Common questions about Ridgeland permits
01 Do I need a building permit in Ridgeland, MS? ▸
02 How much does a building permit cost in Ridgeland, MS? ▸
03 How do I apply for a building permit in Ridgeland, MS? ▸
04 How long does it take to get a building permit in Ridgeland, MS? ▸
05 What work is exempt from building permits in Ridgeland, MS? ▸
06 How do I schedule a building inspection in Ridgeland, MS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Ridgeland -- Building Permits and Inspections Division before applying. Jaspector is not legal advice.