On this page 6
When a permit is required
Permit triggers and exempt work for Webster
All buildings used or occupied in Webster must have a Certificate of Occupancy and required inspections. Permits required per 780 CMR for all regulated construction, alteration, and demolition.
- Exempt Storage buildings accessory to a single-family or two-family residence that are less than 120 sq. ft.
- Exempt Fences not over 7 feet high
- Exempt Retaining walls not over 4 feet in height
- Exempt Water tanks supported directly on grade, capacity not greater than 5,000 gallons
- Exempt Sidewalks and driveways not more than 30 inches above adjacent grade
- Exempt Ordinary repairs to structures
- Exempt Painting, papering, tiling, carpeting, cabinets, and similar finish work
Note: Zoning requirements still apply to exempt work. Confirm edge cases with the Building Department before proceeding.
- Completed permit application
- Original signatures
- Contractor license information (if applicable)
- Workers' compensation documentation
- Relevant construction plans
- Building code
- Massachusetts State Building Code, 780 CMR 9th Edition
- Permit validity
- Work may not begin before permit issuance.
- Owner-builder
- Owner-builder exemption available for occupied 1-2 family dwellings.
- Contractor requirements
- Licensed contractor required. Workers' compensation documentation required. $100 fine for failure to have original permit job card on site during a scheduled inspection.
Source: Building Department ↗
Application process
Typical processing: Varies by project complexity.
- 01 Submit application online or in person at 350 Main Street, Lower Level.
- 02 Original signatures required; confirm whether in-person visit is needed.
- 03 Attach contractor license, workers' compensation documentation, and relevant plans.
- 04 Pay required fees at time of application or as directed.
- 05 Await permit issuance before commencing work.
- 06 Certificate of Occupancy required before occupying any building.
Typical processing time: Varies by project complexity.
Source: Building Department ↗
Fee schedule
Webster building permit fees
Required inspections
Scheduling and sequence
- 508-949-3800, ext. 4005 (phone)
- Plumbing/Gas: 508-341-1456 (Jarrid) (phone)
- Scheduling deadline
- Contact Building Department for scheduling details
- Inspection hours
- Monday, 8:00 a.m. to 7:00 p.m.; Tuesday through Thursday, 8:00 a.m. to 4:00 p.m.; Friday, 8:30 a.m. to noon (confirm current Friday hours with department)
Typical sequence: Standard 780 CMR inspection stages apply: footing, framing, rough MEP, final. Permit card must be on site during all scheduled inspections. Certificate of Occupancy issued upon satisfactory completion of final inspection.
Source: Building Department ↗
Frequently asked
Common questions about Webster permits
01 Do I need a building permit in Webster, MA? ▸
02 How much does a building permit cost in Webster, MA? ▸
03 How do I apply for a building permit in Webster, MA? ▸
04 How long does it take to get a building permit in Webster, MA? ▸
05 What work is exempt from building permits in Webster, MA? ▸
06 How do I schedule a building inspection in Webster, MA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.