When a permit is required
Permit triggers and exempt work for Great Barrington
A building permit is required for all construction within the Town of Great Barrington.
- Exempt One-story detached accessory structures not exceeding 120 sq ft
- Exempt Fences not exceeding 7 feet in height
- Exempt Retaining walls not over 4 feet high
- Exempt Water tanks supported on grade, capacity not exceeding 5,000 gallons
- Exempt Sidewalks and driveways not more than 30 inches above adjacent grade
- Exempt Interior finish work: painting, papering, tiling, carpeting, cabinets, countertops
- Exempt Playground equipment accessory to a detached one- or two-family dwelling
- Exempt Window awnings in Groups R-3 and U occupancies
- Exempt Prefabricated above-ground pools under 24 inches deep and under 5,000 gallons
- Exempt Decks not exceeding 200 sq ft and not more than 30 inches above grade
Note: Same as the statewide 780 CMR 105.2 exemptions; always confirm edge cases with the Building Department.
- Completed online application
- Architectural/engineering plans (scaled, dimensioned)
- Site plan showing property boundaries and proposed construction location
- Workers' Compensation Insurance affidavit (contractors)
- Construction Debris Disposal affidavit
- CSL number or Homeowner Exemption affidavit
- Building code
- Massachusetts State Building Code 780 CMR 10th Edition (effective July 1, 2025, based on 2021 IBC/IRC)
- Permit validity
- Under 780 CMR 105.5, permit expires if work not commenced within six months of issuance, or if suspended/abandoned for six months. Typical completion: two years.
- Owner-builder
- Owner-occupants of one- or two-family dwellings may supervise their own construction work without holding a CSL under 780 CMR 110.R5.
- Contractor requirements
- Construction Supervisor License (CSL) required under 780 CMR 110.R5 for all work on buildings under 35,000 cubic feet and for all detached one- and two-family homes. Home Improvement Contractor (HIC) registration required for applicable residential scopes.
Source: Building Inspections Department (Shared Regional Service) ↗
Application process
Typical processing: Varies; typically 1-3 weeks for initial review.
- 01 Register or log in at permiteyes.us/berkshire/loginuser.php. Select street and street number from dropdown menus, then select permit type.
- 02 Complete the permit application form and upload all required documents and plans.
- 03 If plans require review by Fire, Health, Planning, Conservation, or Water & Sewer, upload them through the portal or bring physical copies to Town Hall.
- 04 Department reviews for 780 CMR and local zoning bylaw compliance.
- 05 Fee calculated and charged; pay online or in person.
- 06 Permit issued; post card at job site.
Typical processing time: Varies; typically 1-3 weeks for initial review.
Source: Building Inspections Department (Shared Regional Service) ↗
Fee schedule
Effective 2024 (PDF available; verify current)
E-check (no charge), Mastercard/Discover (sliding surcharge), or check/cash delivered or mailed to Town Hall 334 Main Street, 2nd floor.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2024 (PDF available; verify current)) before budgeting.
Required inspections
Scheduling and sequence
- 413-528-1619 ext. 2602 (phone)
- Scheduling deadline
- Contact during office hours to schedule.
- Inspection hours
- Monday--Friday, 8:30 AM -- 4:00 PM (or by appointment)
- Time windows
- No specific AM/PM windows published.
Typical sequence: Required stages per 780 CMR 110.3: Footing/Foundation, Frame, Energy Efficiency, Final. Separate trade inspections by Plumbing, Electrical, and Gas inspectors.
Not confirmed; verify with department.
Source: Building Inspections Department (Shared Regional Service) ↗
Frequently asked
Common questions about Great Barrington permits
01 Do I need a building permit in Great Barrington, MA? ▸
02 How much does a building permit cost in Great Barrington, MA? ▸
03 How do I apply for a building permit in Great Barrington, MA? ▸
04 How long does it take to get a building permit in Great Barrington, MA? ▸
05 What work is exempt from building permits in Great Barrington, MA? ▸
06 How do I schedule a building inspection in Great Barrington, MA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspections Department (Shared Regional Service) before applying. Jaspector is not legal advice.