On this page 5
When a permit is required
Permit triggers and exempt work for Orono
All new construction including homes, garages, additions, decks, porches; certain structural repairs; structural alterations including adding or changing doors and windows; demolition work.
- Exempt Fences under 6 feet in height
- Exempt Re-shingling of roofs
- Exempt Interior or exterior painting
- Exempt Replacement of sheetrock
- Exempt Cosmetic changes to structures including new siding (when no structural work involved)
Note: Contact office for confirmation of specific projects.
- Completed application
- Site plan
- Construction plans
- Building code
- MUBEC -- 2021 ICC codes with Maine amendments, effective April 7, 2025. Orono enforces MUBEC (population above 4,000).
- Permit validity
- Not formally published; contact office.
- Owner-builder
- State rules apply.
- Contractor requirements
- Licensed trades required under Maine state law.
Application process
Typical processing: Not formally published; contact office.
- 01 Download the Building Permit application checklist and appropriate permit form from https://www.orono.org/167/Building.
- 02 Complete all required fields in the General Information section and the relevant permit type section.
- 03 Mail completed application to Town of Orono, Code Enforcement, 59 Main Street, Orono, ME 04473.
- 04 Office reviews application and assigns applicable fees; applicant is notified by email with payment instructions.
- 05 Pay fees through the online portal (https://apps1.web.maine.gov) or by contacting Jessica Chadbourne at 207-889-6906 for alternative payment options.
- 06 Permit is issued after payment is received.
- 07 Post permit on job site.
- 08 Request inspections at each required stage through the permit portal or by phone.
Typical processing time: Not formally published; contact office.
Required inspections
Scheduling and sequence
- 207-889-6909 (phone)
- Inspection hours
- Standard business hours
Typical sequence: Foundation, framing, rough trades, insulation, final.
Frequently asked
Common questions about Orono permits
01 Do I need a building permit in Orono, ME? ▸
02 How do I apply for a building permit in Orono, ME? ▸
03 How long does it take to get a building permit in Orono, ME? ▸
04 What work is exempt from building permits in Orono, ME? ▸
05 How do I schedule a building inspection in Orono, ME? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Orono Code Enforcement Office before applying. Jaspector is not legal advice.