On this page 6
§ 01

Permit authority

Town of Hermon Code Enforcement Office

Street address
333 Billings Road, Hermon, ME 04401
Coverage
Town of Hermon. Code Enforcement Officer handles building, plumbing, and land use permits for the town.
Online portal
Town Permits
Town Website
§ 02

When a permit is required

Permit triggers and exempt work for Hermon

Construction, demolition, or structural alteration of buildings.

Minor maintenance and repair not affecting structure or life safety
Cosmetic interior and exterior work (painting, flooring, siding replacement without structural change)
  • Exempt Minor maintenance and repair not affecting structure or life safety
  • Exempt Cosmetic interior and exterior work (painting, flooring, siding replacement without structural change)

Note: Contact office to confirm exemption for a specific project.

Required documents
  • Completed application
  • Site plan
  • Construction plans as needed
Building code
MUBEC (Maine Uniform Building and Energy Code) -- 2021 ICC codes with Maine amendments, effective April 7, 2025.
Permit validity
1 year from date of issuance if substantial work has begun; extends to 2 years if substantial work began within the first year.
Owner-builder
State rules apply.
Contractor requirements
Licensed trades required for electrical, plumbing, mechanical work under Maine state law.

Source: Town of Hermon Code Enforcement Office ↗

§ 03

Application process

Typical processing: Not formally published; contact office.

  1. 01
    Download the appropriate permit application from https://www.hermonmaine.gov/permits/.
  2. 02
    Complete the application with all required project information.
  3. 03
    Submit to the Code Enforcement Office at 333 Billings Road during office hours.
  4. 04
    Staff reviews application and plans.
  5. 05
    Fee is assessed per the applicable permit application fee schedule.
  6. 06
    Permit is issued upon approval.
  7. 07
    Post permit on job site.
  8. 08
    Schedule required inspections at each construction phase.
  9. 09
    Obtain Certificate of Occupancy before occupying new or renovated structure.

Typical processing time: Not formally published; contact office.

Source: Town of Hermon Code Enforcement Office ↗

§ 04

Fee schedule

Hermon building permit fees

Fee type
Amount
01
Minimum permit fee
Listed on permit application forms
02
Plan check fee
Not separately published
03
Permit fee formula
Per application form; project type and size dependent.

Payment at Code Enforcement office during business hours (Mon-Fri, 8am-4pm).

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 207-848-1010 (phone)
  • murphyj@hermonmaine.gov (email)
Inspection hours
Monday through Friday, 8:00 AM to 4:00 PM

Typical sequence: Foundation, framing, rough trades, final; Certificate of Occupancy required before occupancy.

Source: Town of Hermon Code Enforcement Office ↗

§ 06

Frequently asked

Common questions about Hermon permits

01 Do I need a building permit in Hermon, ME?
Construction, demolition, or structural alteration of buildings.
02 How much does a building permit cost in Hermon, ME?
Building permit fees in Hermon, ME are set by the local building department and vary by project type and valuation. The minimum permit fee is Listed on permit application forms. Fees are calculated as: Per application form; project type and size dependent.. Plan check fee: Not separately published.
03 How do I apply for a building permit in Hermon, ME?
To apply for a building permit in Hermon, ME, follow these steps: 1. Download the appropriate permit application from https://www.hermonmaine.gov/permits/. 2. Complete the application with all required project information. 3. Submit to the Code Enforcement Office at 333 Billings Road during office hours. 4. Staff reviews application and plans. 5. Fee is assessed per the applicable permit application fee schedule. 6. Permit is issued upon approval. 7. Post permit on job site. 8. Schedule required inspections at each construction phase. 9. Obtain Certificate of Occupancy before occupying new or renovated structure.
04 How long does it take to get a building permit in Hermon, ME?
Building permit processing times in Hermon, ME typically run Not formally published; contact office.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Hermon, ME?
Not all construction work requires a permit in Hermon, ME. The following work is generally exempt: Minor maintenance and repair not affecting structure or life safety; Cosmetic interior and exterior work (painting, flooring, siding replacement without structural change). Note: Contact office to confirm exemption for a specific project. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Hermon, ME?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Hermon, ME via: 207-848-1010, murphyj@hermonmaine.gov.
last verified April 2026 source Town of Hermon Code Enforcement Office ↗ entry id permits/maine/penobscot/hermon

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Hermon Code Enforcement Office before applying. Jaspector is not legal advice.