When a permit is required
Permit triggers and exempt work for Glen Elder
To improve or relocate a structure on an improvement site in the city. The ordinance also defines structures broadly to include buildings, sheds, fences, garages, concrete slabs, pools, hot tubs, decks, patios, and wheeled trailers/campers with wheels removed.
- Exempt Steps from start to issued permit:
- Exempt When permit required: To improve or relocate a structure on an improvement site in the city. The ordinance also defines structures broadly to include buildings, sheds, fences, garages, concrete slabs, pools, hot tubs, decks, patios, and wheeled trailers/campers with wheels removed.
- Exempt Formula: $25.00 or 0.25 percent of total project cost, whichever is greater
- Exempt No public exemption list found in the permit packet reviewed.
- Exempt City hall page with permit links: [City Hall](https://www.glenelder.com/city-hall.html)
- Exempt Building permit packet: [Building Permit Application and Ordinances PDF](https://www.glenelder.com/uploads/4/7/4/6/47461615/building_permit_application___ordinances.pdf)
- Exempt 2025 minutes showing permit deadline practice: [2025 Council Minutes Archive PDF](https://www.glenelder.com/uploads/4/7/4/6/47461615/2025_glen_elder_ks_city_council_minutes_archive.pdf)
- Name and address of owner, location/description of structure and site, proposed improvement, basement dimensions if any, occupancy class, construction class, materials, estimated cost, start and completion dates, contractor name and address, and other pertinent information. Blueprints with dimensions are required.
- Building code
- The form and ordinance reference Ordinance No. 665. The packet does not clearly publish a modern model code name. Thin data.
- Permit validity
- Permit valid for not more than 6 months from approval unless extended in writing for good cause.
- Owner-builder
- Applicant need not be the owner, but must warrant written authority if not the owner.
- Contractor requirements
- Contractor name and address must be included if applicable.
Fee schedule
Glen Elder building permit fees
Required inspections
Scheduling and sequence
- No standard inspection scheduling system was published. (phone)
- Inspection hours
- Not published.
Typical sequence: The permit packet states the permit or Notice to Proceed must be available at the site for inspection by city employees charged with enforcement.
Frequently asked
Common questions about Glen Elder permits
01 Do I need a building permit in Glen Elder, KS? ▸
02 How much does a building permit cost in Glen Elder, KS? ▸
03 How long does it take to get a building permit in Glen Elder, KS? ▸
04 What work is exempt from building permits in Glen Elder, KS? ▸
05 How do I schedule a building inspection in Glen Elder, KS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City Clerk and Building Permit Committee, with code enforcement support. before applying. Jaspector is not legal advice.