On this page 6
When a permit is required
Permit triggers and exempt work for 2) Afton
No building or other structure may be erected, altered, used, or occupied within the city without first receiving a permit
- Exempt FAQ says no permit is required for interior work, replacing shingles, or siding
- Exempt FAQ also says a permit is not needed for a one-story detached accessory structure used as a tool or storage shed, playhouse, or similar use if setbacks are met and the floor area does not exceed 200 square feet
- Applicant name/address, street address and legal description, nature of proposed work, use, drawings to scale as required, and plot diagram
- Building code
- International Building Code, 2018 edition, with local amendments; city code also adopts related residential, mechanical, fuel gas, plumbing, electrical, fire, property maintenance, energy conservation, existing building, and swimming pool/spa codes
- Permit validity
- Permit becomes void if construction is not initiated and underway within one year from the date of issuance; code also requires some pre-existing approvals to start within six months and finish within two years after the effective date of the chapter
- Owner-builder
- FAQ says homeowners can do work on their own homestead dwelling, not rental units; permits and inspections are required for major remodels and additions and are issued to the homestead property owner of record
- Contractor requirements
- No contractor licensing rule found in the reviewed material; third-party inspections may be accepted under the energy code
Application process
Typical processing: within a reasonable time; no published service level
- 01 Submit written application to the Council with name/address, location and legal description, proposed work, use, drawings, and plot diagram
- 02 Building Inspector reviews the application within a reasonable time
- 03 If compliant, the Building Inspector instructs the Clerk to issue the permit
- 04 If disapproved, reasons are provided to the applicant
Typical processing time: within a reasonable time; no published service level
Fee schedule
2) Afton building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Not published (phone)
- City Hall and the Building Inspector are the points of contact (phone)
- Inspection hours
- City Hall hours are 8:00 a.m. to 4:30 p.m., Monday through Friday
Typical sequence: Submit application and plans, inspector review, permit issuance, construction, and city follow-up under the permit conditions
Not published
Frequently asked
Common questions about 2) Afton permits
01 Do I need a building permit in 2) Afton, IA? ▸
02 How much does a building permit cost in 2) Afton, IA? ▸
03 How do I apply for a building permit in 2) Afton, IA? ▸
04 How long does it take to get a building permit in 2) Afton, IA? ▸
05 What work is exempt from building permits in 2) Afton, IA? ▸
06 How do I schedule a building inspection in 2) Afton, IA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Afton City Hall / Clerk; building work is reviewed by the Building Inspector under the city code before applying. Jaspector is not legal advice.