When a permit is required
Permit triggers and exempt work for 1) Union County unincorporated area
Septic construction requires a permit; floodplain development requires a permit before any man-made change in the floodplain; county does not publish a general building permit program for unincorporated areas
- Exempt Thin data for county general building work. Published county materials only clearly identify septic, well, and floodplain regulated work
- Exempt Floodplain ordinance does not describe a simple exempt-work list on the pages reviewed
- Septic application, site and soil analysis or perc test, and engineer design if required; floodplain application must include work description, site description, location and dimensions of buildings/additions, intended use, base flood elevation, lowest floor elevation, estimated cost for improvements/rebuilds, and other information the administrator deems necessary
- Building code
- No countywide general building code found for unincorporated areas; floodplain ordinance references state and federal floodplain standards and Iowa Administrative Code Chapter 69 for onsite wastewater systems
- Permit validity
- Not published for county septic permits; floodplain permit validity/expiration not published
- Owner-builder
- Owner can self-install septic only if they sign the ownership conditions, accept liability, follow state code and local policy, pay extra inspection fees if needed, expose all system parts for inspection, and show proof of at least 6 credit hours in onsite wastewater systems within the last 12 months before construction begins
- Contractor requirements
- Septic contractors must be registered with Union County Environmental Health; the county maintains a contractor registration form
Fee schedule
1) Union County unincorporated area building permit fees
Required inspections
Scheduling and sequence
- Septic permit states the health office must be notified 24 hours in advance for final inspection (phone)
- Inspection hours
- Office hours 8:30 a.m. to 4:00 p.m., Monday through Friday, hours may vary
Typical sequence: Soil analysis or perc test, site evaluation, permit issuance, pre-construction meeting if needed, construction, inspection, approval, and as-built drawing/letter
Extra inspection charge is $50 each if more than the two included inspections are needed
Frequently asked
Common questions about 1) Union County unincorporated area permits
01 Do I need a building permit in 1) Union County unincorporated area, IA? ▸
02 How much does a building permit cost in 1) Union County unincorporated area, IA? ▸
03 How long does it take to get a building permit in 1) Union County unincorporated area, IA? ▸
04 What work is exempt from building permits in 1) Union County unincorporated area, IA? ▸
05 How do I schedule a building inspection in 1) Union County unincorporated area, IA? ▸