When a permit is required
Permit triggers and exempt work for Story City
Story City's posted Safe Building procedure says all new construction, remodels, additions, enlargements, repair, moving, removal, conversion, demolition, and alterations require a building permit, as do decks, fences, signs, and sheds. Trade permits are required for plumbing, electrical, and mechanical work.
Note: No public exemption list was identified in the reviewed Story City materials.
- Signed permit application
- Building plans
- Site plan with setbacks and existing/proposed structures
- Work description
- Energy compliance information
- Trade permits where needed
- Building code
- Safe Building procedure requires compliance with applicable building code and city ordinances; energy code compliance information is required.
- Permit validity
- Permit is valid for 1 year and work must commence within 180 days from issuance under the reviewed Safe Building procedure.
- Owner-builder
- Not separately summarized on the reviewed Story City materials.
- Contractor requirements
- Not separately summarized on the reviewed Story City materials; trade permits route through Safe Building.
Source: City of Story City ↗
Application process
Typical processing: Not publicly posted on the reviewed city page.
- 01 Review the permit instructions on the Story City Forms page and choose the correct permit form.
- 02 Submit the appropriate permit form to City Hall, including setbacks and drawings.
- 03 City Hall contacts the applicant when the permit is approved by the city administrator.
- 04 Pay fees at City Hall or on the website, then complete the work.
- 05 Contact Safe Building when the project is complete for final inspection; City Hall then sends the final inspection certificate or certificate of occupancy for new builds.
Typical processing time: Not publicly posted on the reviewed city page.
Source: City of Story City ↗
Fee schedule
Story City building permit fees
City says fees may be paid at City Hall or on the website
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Contact Safe Building (phone)
- Scheduling deadline
- One business day notice is required on all inspections; inspections are completed by the end of the next business day
Typical sequence: Footing, foundation, foundation insulation, sewer/water/storm, groundwork plumbing, plumbing, electrical, mechanical, framing, insulation, sidewalk/approach, and final
Source: City of Story City ↗
Frequently asked
Common questions about Story City permits
01 Do I need a building permit in Story City, IA? ▸
02 How much does a building permit cost in Story City, IA? ▸
03 How do I apply for a building permit in Story City, IA? ▸
04 How long does it take to get a building permit in Story City, IA? ▸
05 How do I schedule a building inspection in Story City, IA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Story City before applying. Jaspector is not legal advice.