When a permit is required
Permit triggers and exempt work for New Whiteland
New Whiteland's residential packet covers new homes, duplexes, additions, remodels and basement finishes, electrical-only work, accessory structures, fences, and swimming pools. Commercial and multi-family packets cover new buildings, additions, remodels, electrical-only work, signs, trailers, wireless and solar or wind systems, and fire-repair work.
- Application, parcel number, site plan, erosion control plan where applicable, COMcheck energy certificate where applicable, construction plans, firefighter safety notification for new primary structures, state construction design release for applicable nonresidential work, health department approvals when applicable, and stormwater permit application for the listed project types.
- Building code
- New Whiteland packets rely on current Indiana code administration and COMcheck energy compliance. Specific code editions were not separately summarized on the reviewed planning page.
- Permit validity
- The reviewed packets state the applicant represents work will start within 90 days; if work does not start in good faith within 90 days, the application is void.
- Contractor requirements
- New Whiteland packets route code and inspection questions to the permit administrator; the reviewed public pages did not post a separate contractor registration manual.
Application process
Application → plan check → issuance → inspection → final
- 01 Download the correct New Whiteland permit packet for single or two-family, commercial or industrial, or multi-family work.
- 02 Assemble the required submittal items for the project type such as site plan, erosion control plan, energy certificate, construction plans, and state approvals when required.
- 03 Submit by email to permits@newwhiteland.in.gov, through the state eGov permit application, or hand deliver to 540 Tracy Road, Suite A during posted office hours.
- 04 Pay the $15 processing fee at the time of application.
- 05 Wait for local review; New Whiteland's packets note the permit fee and inspection fees are paid when the permit is issued.
- 06 Obtain the issued permit and schedule the required inspections through the permit administrator or planning office.
- 07 Pay any reinspection or added inspection fees before final inspection or Certificate of Occupancy when required.
Fee schedule
New Whiteland building permit fees
Processing fee is due when the application is submitted. Permit fee and inspection fees are due when the permit is issued.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Through the permit administrator and planning office contacts listed in the packets (contact)
- Inspection hours
- The planning page says permit applications can be hand delivered Monday through Friday from 7:00 am to 12:00 pm and 1:00 pm to 4:00 pm; no separate public inspection time window was clearly posted
Typical sequence: Residential and commercial packets include footing or foundation, under slab, rough-in electrical, rough-in plumbing, rough-in HVAC, rough-in framing, insulation or energy-efficiency, and final inspections, with other inspections as needed
Multiple, incomplete, failed, or added inspections are charged as reinspection or additional inspection fees and must be paid before final approval as determined by the inspector
Frequently asked
Common questions about New Whiteland permits
01 Do I need a building permit in New Whiteland, IN? ▸
02 How much does a building permit cost in New Whiteland, IN? ▸
03 How do I apply for a building permit in New Whiteland, IN? ▸
04 How do I schedule a building inspection in New Whiteland, IN? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Zoning, Town of New Whiteland before applying. Jaspector is not legal advice.