How to apply for a building permit in Village of Romeoville, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
IBC 2021, IRC 2021, IEBC 2021, NEC 2020.
Avg processing
7-10 business days.
Min. permit fee
$50.00
Last verified
March 2026
On this page 6
§ 01

Permit authority

Community Development Department, Building Division

Street address
1050 W. Romeo Rd., Romeoville, IL 60446
Coverage
Serves the Village of Romeoville.
Online portal
OpenGov
OpenGov
§ 02

When a permit is required

Permit triggers and exempt work for Romeoville

Any structure modifications, roofing, siding, decks, fences, pools, basement finishes.

Painting and wall covering.
Replacement of minor electrical/plumbing fixtures (not affecting system integrity).
Detached sheds under 100 sq. ft. (zoning check still required).
  • Exempt Painting and wall covering.
  • Exempt Replacement of minor electrical/plumbing fixtures (not affecting system integrity).
  • Exempt Detached sheds under 100 sq. ft. (zoning check still required).

Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Community Development Department before proceeding.

Required documents
  • Plat of Survey
  • Construction drawings
  • Energy code compliance for new builds
Building code
IBC 2021, IRC 2021, IEBC 2021, NEC 2020.
Permit validity
1 year.
Owner-builder
Homeowners may perform work on their own residence; registration required for GCs.
Contractor requirements
Registration, insurance, and $20,000 bond required.

Source: Community Development Department, Building Division ↗

§ 03

Application process

Typical processing: 7-10 business days.

  1. 01
    Create account on Romeoville OpenGov portal.
  2. 02
    Select permit category and fill out digital application.
  3. 03
    Upload plans, Plat of Survey, and contractor info.
  4. 04
    Department reviews for zoning and code compliance.
  5. 05
    Fees are calculated and invoiced via portal.
  6. 06
    Once paid, permit is issued and available for download.

Typical processing time: 7-10 business days.

Source: Community Development Department, Building Division ↗

§ 04

Fee schedule

Romeoville building permit fees

Fee type
Amount
01
Minimum permit fee
$50.00
02
Plan check fee
Calculated per project.
03
Permit fee formula
Mix of flat fees and valuation-based.
04
Trade permit fee
Included in permit fees
05
Reinspection fee
$75.00 per failure.

Online portal payment accepted.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (815) 886-7200 (phone)
  • buildinginspections@romeoville.org (email)
Scheduling deadline
Approved plans must be on-site.
Inspection hours
7:00 AM - 11:00 AM (AM slot), 1:00 PM - 3:00 PM (PM slot)
Time windows
AM: 7:00 AM - 11:00 AM, PM: 1:00 PM - 3:00 PM

Typical sequence: Typical sequence: Rough Building, Rough Electric, Rough Plumbing, Final.

Remote video inspections may be used for certain inspection types at the village's discretion.

Source: Community Development Department, Building Division ↗

§ 06

Frequently asked

Common questions about Romeoville permits

01 Do I need a building permit in Romeoville, IL?
Any structure modifications, roofing, siding, decks, fences, pools, basement finishes.
02 How much does a building permit cost in Romeoville, IL?
Building permit fees in Romeoville, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $50.00. Fees are calculated as: Mix of flat fees and valuation-based.. Plan check fee: Calculated per project..
03 How do I apply for a building permit in Romeoville, IL?
To apply for a building permit in Romeoville, IL, follow these steps: 1. Create account on Romeoville OpenGov portal. 2. Select permit category and fill out digital application. 3. Upload plans, Plat of Survey, and contractor info. 4. Department reviews for zoning and code compliance. 5. Fees are calculated and invoiced via portal. 6. Once paid, permit is issued and available for download.
04 How long does it take to get a building permit in Romeoville, IL?
Building permit processing times in Romeoville, IL typically run 7-10 business days.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Romeoville, IL?
Not all construction work requires a permit in Romeoville, IL. The following work is generally exempt: Painting and wall covering.; Replacement of minor electrical/plumbing fixtures (not affecting system integrity).; Detached sheds under 100 sq. ft. (zoning check still required).. Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Community Development Department before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Romeoville, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Romeoville, IL via: (815) 886-7200, buildinginspections@romeoville.org. Approved plans must be on-site..
last verified March 2026 source Community Development Department, Building Division ↗ entry id permits/illinois/will/romeoville

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department, Building Division before applying. Jaspector is not legal advice.