jaspector
§ IL Will County
City building permits

Village of Bolingbrook

How to apply for a building permit in Village of Bolingbrook, Illinois. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$50.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building and Safety Division, Public Services & Development Department

Street address
375 W. Briarcliff Rd., Bolingbrook, IL 60440
Coverage
Covers the Village of Bolingbrook, including portions in Will and DuPage Counties.
Online portal
OpenGov (Viewpoint Cloud)
OpenGov (Viewpoint Cloud)
§ 02

When a permit is required

Permit triggers and exempt work for Bolingbrook

Any construction, alteration, or repair of a structure, including decks, fences, pools, roofing, and interior remodels.

General maintenance and minor repairs.
Painting, floor covering, and trim work.
Retaining walls less than 2 feet in height.
One-story detached accessory structures under 120 sq. ft. (though zoning setbacks still apply).
  • Exempt General maintenance and minor repairs.
  • Exempt Painting, floor covering, and trim work.
  • Exempt Retaining walls less than 2 feet in height.
  • Exempt One-story detached accessory structures under 120 sq. ft. (though zoning setbacks still apply).

Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building and Safety Division before proceeding.

Required documents
  • Plat of Survey
  • Construction Drawings
  • Contractor Registration proof
Building code
IBC 2021, IRC 2021, IEBC 2021, NEC 2023 (Updated to meet 2025 IL mandate).
Permit validity
1 year from date of issuance.
Owner-builder
Homeowners may act as general contractor for their own primary residence.
Contractor requirements
All contractors must be registered with Bolingbrook ($260 for General, $160 for Subs).

Source: Building and Safety Division, Public Services & Development Department ↗

§ 03

Application process

Typical processing: 7-10 business days for standard residential.

  1. 01
    Create an account on the OpenGov portal.
  2. 02
    Select the specific permit type and complete the online application.
  3. 03
    Upload required documents (PDF format).
  4. 04
    Pay any initial submittal/plan review fees.
  5. 05
    Tracking status and responding to plan review comments is done through the portal.
  6. 06
    Once approved, pay final fees online and download the issued permit.

Typical processing time: 7-10 business days for standard residential.

Source: Building and Safety Division, Public Services & Development Department ↗

§ 04

Fee schedule

Bolingbrook building permit fees

Fee type
Amount
01
Minimum permit fee
$50.00
02
Plan check fee
Varies; often part of the base permit fee.
03
Permit fee formula
Combination of flat fees for small items and valuation-based for major construction.
04
Trade permit fee
Included in permit fees
05
Reinspection fee
$50.00 - $100.00

Online via credit card or e-check.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
24-48 hour notice recommended.
Inspection hours
Monday - Friday, 8:30 AM - 4:00 PM
Time windows
Standard business hours

Typical sequence: Typical sequence: Footing, Rough, Insulation, Final.

Remote video inspections may be used for certain inspection types at the village's discretion.

Source: Building and Safety Division, Public Services & Development Department ↗

§ 06

Frequently asked

Common questions about Bolingbrook permits

01 Do I need a building permit in Bolingbrook, IL?
Any construction, alteration, or repair of a structure, including decks, fences, pools, roofing, and interior remodels.
02 How much does a building permit cost in Bolingbrook, IL?
Building permit fees in Bolingbrook, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $50.00. Fees are calculated as: Combination of flat fees for small items and valuation-based for major construction.. Plan check fee: Varies; often part of the base permit fee..
03 How do I apply for a building permit in Bolingbrook, IL?
To apply for a building permit in Bolingbrook, IL, follow these steps: 1. Create an account on the OpenGov portal. 2. Select the specific permit type and complete the online application. 3. Upload required documents (PDF format). 4. Pay any initial submittal/plan review fees. 5. Tracking status and responding to plan review comments is done through the portal. 6. Once approved, pay final fees online and download the issued permit.
04 How long does it take to get a building permit in Bolingbrook, IL?
Building permit processing times in Bolingbrook, IL typically run 7-10 business days for standard residential.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Bolingbrook, IL?
Not all construction work requires a permit in Bolingbrook, IL. The following work is generally exempt: General maintenance and minor repairs.; Painting, floor covering, and trim work.; Retaining walls less than 2 feet in height.; One-story detached accessory structures under 120 sq. ft. (though zoning setbacks still apply).. Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building and Safety Division before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Bolingbrook, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bolingbrook, IL via: OpenGov portal, (630) 226-8800. 24-48 hour notice recommended..
last verified April 2026 source Building and Safety Division, Public Services & Development Department ↗ entry id permits/illinois/will/bolingbrook

Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Safety Division, Public Services & Development Department before applying. Jaspector is not legal advice.