On this page 5
When a permit is required
Permit triggers and exempt work for Bement
Building permits required prior to construction, alteration, moving, demolition, or repair of any building or structure per the Bement village code.
Note: Specific exemptions not published online. Contact village at (217) 678-4741 for complete list.
- Completed building permit application form
- Site plan
- Construction plans
- Building code
- Not reported to Illinois CDB Code Directory. As of January 1, 2025, Illinois PA 103-0510 mandates IBC 2021, IRC 2021, IEBC 2021, NEC 2023, Illinois Energy Conservation Code, Illinois Accessibility Code, and Illinois Plumbing Code as statewide minimum standards. Confirm locally-adopted edition with village.
- Contractor requirements
- No Illinois state general contractor license. IDFPR-licensed electricians and plumbers required for those trades.
Application process
Application → plan check → issuance → inspection → final
- 01 Contact Village of Bement at (217) 678-4741 to obtain a building permit application.
- 02 Submit completed application in person at the village office (143 W. Wilson St.).
- 03 Include required site plan and construction documents.
- 04 Pay applicable fees.
- 05 Permit issued. Schedule inspections as required.
Source: Village Office ↗
Required inspections
Scheduling and sequence
- (217) 678-4741 (phone)
Typical sequence: Not publicly documented.
Frequently asked
Common questions about Bement permits
01 Do I need a building permit in Bement, IL? ▸
02 How do I apply for a building permit in Bement, IL? ▸
03 How do I schedule a building inspection in Bement, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village Office before applying. Jaspector is not legal advice.