jaspector
City building permits

Village of Dunlap

How to apply for a building permit in Village of Dunlap, Illinois. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Village of Dunlap (Permitting contracted to Peoria County)

Street address
210 E. Second St, Dunlap, IL 61525
Coverage
Dunlap village limits; building enforcement by Peoria County.
Online portal
Peoria County Building Permits
Manual/Email
§ 02

When a permit is required

Permit triggers and exempt work for Dunlap

See Unincorporated Peoria County for technical requirements.

One-story detached accessory structures < 200 sq. ft. (Building permit exempt, but zoning setbacks apply)
Fences under 7 feet (Building permit exempt, but zoning certificate may be required)
Retaining walls under 4 feet
Decks under 25 sq. ft.
  • Exempt One-story detached accessory structures < 200 sq. ft. (Building permit exempt, but zoning setbacks apply)
  • Exempt Fences under 7 feet (Building permit exempt, but zoning certificate may be required)
  • Exempt Retaining walls under 4 feet
  • Exempt Decks under 25 sq. ft.

Note: Building permit exempt does not mean exempt from zoning requirements. Confirm edge cases with Peoria County Planning & Zoning before proceeding.

Required documents
  • Application
  • Site Plan (must show setbacks)
  • Construction Plans
  • Illinois Energy Conservation Code compliance
Building code
2018 IRC, 2018 IBC (transitioning to 2021 per state mandate), 2017 NEC, 2021 IL Energy Conservation Code.
Permit validity
6 months to start; 1 year to complete.
Owner-builder
Owner-builders are allowed for primary residence.
Contractor requirements
State license required for Plumbers and Roofers. Septic contractors must be registered with the Health Dept.

Source: Village of Dunlap (Permitting contracted to Peoria County) ↗

§ 03

Application process

Typical processing: See Peoria County (Residential: 2-3 business days; Commercial: 14 business days).

  1. 01
    Contact Village Hall for local zoning approval/certificate.
  2. 02
    Submit building permit application to Peoria County Planning & Zoning.
  3. 03
    Follow Peoria County process for review and issuance.

Typical processing time: See Peoria County (Residential: 2-3 business days; Commercial: 14 business days).

Source: Village of Dunlap (Permitting contracted to Peoria County) ↗

§ 04

Fee schedule

Dunlap building permit fees

Fee type
Amount
01
Minimum permit fee
$750 (New Construction), $250 (Additions/Alterations)
02
Plan check fee
Included in permit fee.
03
Permit fee formula
$0.50 per sq. ft. for residential new/additions; $0.20 per sq. ft. for accessory structures.
04
Reinspection fee
$75 Reinspection fee

3% service charge for credit cards. $45 Technology Fee added to all permits.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (309) 672-6915 (phone)
Inspection hours
Monday-Friday, 8:30 AM to 4:30 PM

Typical sequence: Typical sequence: Footing, Foundation, Under-slab, Rough-in, Framing, Insulation, Final.

Source: Village of Dunlap (Permitting contracted to Peoria County) ↗

§ 06

Frequently asked

Common questions about Dunlap permits

01 Do I need a building permit in Dunlap, IL?
See Unincorporated Peoria County for technical requirements.
02 How much does a building permit cost in Dunlap, IL?
Building permit fees in Dunlap, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $750 (New Construction), $250 (Additions/Alterations). Fees are calculated as: $0.50 per sq. ft. for residential new/additions; $0.20 per sq. ft. for accessory structures.. Plan check fee: Included in permit fee..
03 How do I apply for a building permit in Dunlap, IL?
To apply for a building permit in Dunlap, IL, follow these steps: 1. Contact Village Hall for local zoning approval/certificate. 2. Submit building permit application to Peoria County Planning & Zoning. 3. Follow Peoria County process for review and issuance.
04 How long does it take to get a building permit in Dunlap, IL?
Building permit processing times in Dunlap, IL typically run See Peoria County (Residential: 2-3 business days; Commercial: 14 business days).. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Dunlap, IL?
Not all construction work requires a permit in Dunlap, IL. The following work is generally exempt: One-story detached accessory structures < 200 sq. ft. (Building permit exempt, but zoning setbacks apply); Fences under 7 feet (Building permit exempt, but zoning certificate may be required); Retaining walls under 4 feet; Decks under 25 sq. ft.. Note: Building permit exempt does not mean exempt from zoning requirements. Confirm edge cases with Peoria County Planning & Zoning before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Dunlap, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Dunlap, IL via: (309) 672-6915.
last verified April 2026 source Village of Dunlap (Permitting contracted to Peoria County) ↗ entry id permits/illinois/peoria/dunlap

Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Dunlap (Permitting contracted to Peoria County) before applying. Jaspector is not legal advice.