jaspector
City building permits

Village of Hudson

How to apply for a building permit in Village of Hudson, Illinois. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$25.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

Village of Hudson — Zoning and Permit Department

Street address
109 Front St., P.O. Box 221, Hudson, IL 61748
Coverage
Covers construction within Hudson village limits. Note: Prior to issuance of an accessory structure permit, the village requires residents to obtain approval from the McLean County Health Department. Properties outside village limits are subject to unincorporated McLean County jurisdiction.
§ 02

When a permit is required

Permit triggers and exempt work for Hudson

New home, room addition, basement finishing and remodeling, kitchen or bath remodeling, deck, driveway, fence, garage, garden shed, parking pads, roof, and pools all require a building permit.

Required documents
  • Completed Form APEBP-669
  • Site plan
  • Section IX (back page, mandatory for all projects)
  • For accessory structures, McLean County Health Department approval documentation
  • For pools, Form P-001 and County Health Department approval
Permit validity
All building permits are limited to one year. Work must begin within 90 days of issuance; a permit expires 91 days after issuance if work has not commenced. If work commences by day 90, the permit remains valid for one year from issuance date.
Contractor requirements
Residents must comply with all village ordinances including regulations pertaining to plumbing, electrical, and mechanical work. State-licensed electricians (IDFPR) and plumbers (IDFPR) are required. If the village contracts with outside professionals (consulting engineers or architects) for reviews or inspections, the applicant may be required to pay additional fees. Contact (309) 726-1471 for any local contractor registration requirements.

Source: Village of Hudson — Zoning and Permit Department ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Call (309) 726-1471 and leave a message to schedule an appointment (the village strongly encourages contacting the Zoning and Permit Department before starting a project to avoid delays or issues with incomplete applications).
  2. 02
    Download Form APEBP-669 Building Permit Application from the village website.
  3. 03
    Complete Sections I and II (all projects); Section III (new buildings or additions only); Section IV (all projects, requires signature); Section IX / back page (all projects, mandatory).
  4. 04
    For accessory structures (sheds, garages, pools): obtain McLean County Health Department approval first, then submit to village.
  5. 05
    For outdoor pools, spas, and hot tubs with water depth of 24 inches or more: complete Form P-001 Outdoor Pool Permit Application and Checklist in addition to the building permit application.
  6. 06
    Submit completed application(s) with required documentation and payment.
  7. 07
    Permit is issued.
  8. 08
    Schedule required inspections. Pools/spas must be inspected before filling with water.

Source: Village of Hudson — Zoning and Permit Department ↗

§ 04

Fee schedule

Hudson building permit fees

Fee type
Amount
01
Minimum permit fee
$25.00
02
Permit fee formula
A fee schedule is used to determine permit fees for new commercial and residential construction, developed to reflect the amount of work needed to inspect the property. The village may require additional fees if outside professionals (engineers, architects) are contracted for review.

In person at Village Hall.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (309) 726-1471 (phone)

Typical sequence: Pools/spas must pass inspection before filling with water. Additional inspection sequence (foundation, rough-in, final) likely required for other project types; confirm with village.

Source: Village of Hudson — Zoning and Permit Department ↗

§ 06

Frequently asked

Common questions about Hudson permits

01 Do I need a building permit in Hudson, IL?
New home, room addition, basement finishing and remodeling, kitchen or bath remodeling, deck, driveway, fence, garage, garden shed, parking pads, roof, and pools all require a building permit.
02 How much does a building permit cost in Hudson, IL?
Building permit fees in Hudson, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $25.00. Fees are calculated as: A fee schedule is used to determine permit fees for new commercial and residential construction, developed to reflect the amount of work needed to inspect the property. The village may require additional fees if outside professionals (engineers, architects) are contracted for review..
03 How do I apply for a building permit in Hudson, IL?
To apply for a building permit in Hudson, IL, follow these steps: 1. Call (309) 726-1471 and leave a message to schedule an appointment (the village strongly encourages contacting the Zoning and Permit Department before starting a project to avoid delays or issues with incomplete applications). 2. Download Form APEBP-669 Building Permit Application from the village website. 3. Complete Sections I and II (all projects); Section III (new buildings or additions only); Section IV (all projects, requires signature); Section IX / back page (all projects, mandatory). 4. For accessory structures (sheds, garages, pools): obtain McLean County Health Department approval first, then submit to village. 5. For outdoor pools, spas, and hot tubs with water depth of 24 inches or more: complete Form P-001 Outdoor Pool Permit Application and Checklist in addition to the building permit application. 6. Submit completed application(s) with required documentation and payment. 7. Permit is issued. 8. Schedule required inspections. Pools/spas must be inspected before filling with water.
04 How do I schedule a building inspection in Hudson, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Hudson, IL via: (309) 726-1471.
last verified April 2026 source Village of Hudson — Zoning and Permit Department ↗ entry id permits/illinois/mclean/hudson

Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Hudson — Zoning and Permit Department before applying. Jaspector is not legal advice.