When a permit is required
Permit triggers and exempt work for McLean County
Permits are required for most construction projects prior to start of construction. Residential triggers include: home additions (decks, porches, patios), detached structures (storage buildings, play equipment, pools), new homes, ponds, and most fences. Construction permits are required for any improvement to or addition to a building, structure, or land improvement; relocation of a building; or any structural alteration that changes the use of a building. Application for commercial building permits must be accompanied by plans, specifications, and supplementary information.
Note: The agricultural exemption is primarily a zoning exemption; building code compliance obligations under PA 103-0510 may still apply to certain agricultural structures. Confirm project-specific applicability with the department.
- Completed permit application
- Site plans and specifications
- For commercial projects, full construction documents complying with the adopted building codes
- Commercial Building Inspection Form
- Permit validity
- Not explicitly stated on reviewed pages; contact (309) 888-5160.
- Contractor requirements
- State-licensed electricians (IDFPR) and plumbers (IDFPR) required. Illinois has no statewide general contractor license; any additional local registration requirements should be confirmed with the department at (309) 888-5160.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the property is in an unincorporated area (not within any municipality). If within a municipality, contact that municipality's building department instead.
- 02 Download the Building Permit Requirements PDF from https://www.mcleancountyil.gov/687/Building-Permits (PDF link on that page).
- 03 For commercial projects, review the Commercial Building Permit Requirements PDF and the Commercial Building Inspection Form PDF at https://www.mcleancountyil.gov/606/Commercial-Building-Permit-Requirements.
- 04 Complete the application with required plans, specifications, and supporting information.
- 05 Submit application and pay permit fee at Room M102.
- 06 Stake-out inspection is scheduled (verifies improvement location on site).
- 07 Foundation inspection is scheduled.
- 08 Final inspection is completed before occupancy permit is issued.
Fee schedule
Effective 2026 (verify for current updates)
In person at Room M102. Contact department to confirm payment methods accepted. Fees are subject to change by County Board action; verify current fees at (309) 888-5160.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026 (verify for current updates)) before budgeting.
Required inspections
Scheduling and sequence
- (309) 888-5160 (phone)
- Inspection hours
- Monday-Friday, 8:00 a.m. to 4:30 p.m.
Typical sequence: 1. Stake-out inspection — verifies location of improvement on the lot before construction begins. 2. Foundation inspection — verifies foundation before covering. 3. Final inspection — conducted upon completion; occupancy permit is issued after passing final inspection.
Frequently asked
Common questions about unincorporated McLean County permits
01 Do I need a building permit in unincorporated McLean County, IL? ▸
02 How much does a building permit cost in unincorporated McLean County, IL? ▸
03 How do I apply for a building permit in unincorporated McLean County, IL? ▸
04 How do I schedule a building inspection in unincorporated McLean County, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with McLean County Department of Building and Zoning before applying. Jaspector is not legal advice.