Unincorporated Macoupin County

How to apply for a building permit in unincorporated Macoupin County, Illinois. Permit authority, application steps, fees, and inspection requirements.

Avg processing
5-10 business days
Min. permit fee
$100.00
Last verified
April 2026
On this page 5
§ 01

Permit authority

Macoupin County Supervisor of Assessments / GIS Department

Street address
215 S. East St., Carlinville, IL 62626
Coverage
Covers all areas outside the incorporated limits of cities and villages. Macoupin County has no county-wide zoning ordinance.
Online portal
Building Permit and PTAX Form
Manual PDF
§ 02

When a permit is required

Permit triggers and exempt work for Macoupin County

Any new construction that requires a septic system or any substantial improvement to existing structures in unincorporated areas.

Cosmetic work (painting, wallpapering, flooring)
Minor repairs not affecting structural integrity
Fences (in unincorporated areas only; verify setbacks)
Small sheds not requiring septic
  • Exempt Cosmetic work (painting, wallpapering, flooring)
  • Exempt Minor repairs not affecting structural integrity
  • Exempt Fences (in unincorporated areas only; verify setbacks)
  • Exempt Small sheds not requiring septic
Required documents
  • Completed PTAX-760 form
  • Site plan
  • 911 address
  • Septic permit
Building code
Illinois Public Act 103-0510 (Statewide Mandatory Codes). Effective January 1, 2025: 2021 IBC (Commercial), 2021 IRC (Residential), 2021 IEBC (Existing Buildings), 2023 NEC (Electrical).
Permit validity
Generally valid for 1 year or until construction completion.
Owner-builder
Owner-builders are allowed and must comply with 2025 state mandates.
Contractor requirements
No county-wide general contractor license. Roofing contractors must be state-licensed. Plumbers must be state-licensed through IDFPR.
§ 03

Application process

Typical processing: 5-10 business days

  1. 01
    Determine if the project is in an unincorporated area and requires a septic system.
  2. 02
    Assign a 911 address through the 911 Coordinator (217-854-3181) if not already assigned.
  3. 03
    Obtain a Private Sewage Construction Permit from the Macoupin County Public Health Department (217-854-3223).
  4. 04
    Complete the Building Program Permit & PTAX-760 form.
  5. 05
    Submit form and $100 fee to the GIS Manager/Supervisor of Assessments.

Typical processing time: 5-10 business days

Source: Macoupin County Supervisor of Assessments / GIS Department ↗

§ 04

Fee schedule

Macoupin County building permit fees

Fee type
Amount
01
Minimum permit fee
$100.00
02
Plan check fee
None (County does not perform plan reviews for unincorporated residential)
03
Permit fee formula
Flat fee of $100.00 for the Building Program Permit

Check or money order payable to Macoupin County Treasurer.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Frequently asked

Common questions about unincorporated Macoupin County permits

01 Do I need a building permit in unincorporated Macoupin County, IL? ▸
Any new construction that requires a septic system or any substantial improvement to existing structures in unincorporated areas.
02 How much does a building permit cost in unincorporated Macoupin County, IL? ▸
Building permit fees in unincorporated Macoupin County, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $100.00. Fees are calculated as: Flat fee of $100.00 for the Building Program Permit. Plan check fee: None (County does not perform plan reviews for unincorporated residential).
03 How do I apply for a building permit in unincorporated Macoupin County, IL? ▸
To apply for a building permit in unincorporated Macoupin County, IL, follow these steps: 1. Determine if the project is in an unincorporated area and requires a septic system. 2. Assign a 911 address through the 911 Coordinator (217-854-3181) if not already assigned. 3. Obtain a Private Sewage Construction Permit from the Macoupin County Public Health Department (217-854-3223). 4. Complete the Building Program Permit & PTAX-760 form. 5. Submit form and $100 fee to the GIS Manager/Supervisor of Assessments.
04 How long does it take to get a building permit in unincorporated Macoupin County, IL? ▸
Building permit processing times in unincorporated Macoupin County, IL typically run 5-10 business days. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in unincorporated Macoupin County, IL? ▸
Not all construction work requires a permit in unincorporated Macoupin County, IL. The following work is generally exempt: Cosmetic work (painting, wallpapering, flooring); Minor repairs not affecting structural integrity; Fences (in unincorporated areas only; verify setbacks); Small sheds not requiring septic. When in doubt, confirm with the local building department before starting work.
last verified April 2026 source Macoupin County Supervisor of Assessments / GIS Department ↗ entry id permits/illinois/macoupin/macoupin-county

Educational reference. Permit rules and fees change — confirm current requirements directly with Macoupin County Supervisor of Assessments / GIS Department before applying. Jaspector is not legal advice.