When a permit is required
Permit triggers and exempt work for Grundy County
Required for new construction, additions, structural alterations, decks, fences, pools, roofing, siding, and solar installations.
- Exempt Cosmetic painting and wallpapering
- Exempt Floor coverings (carpeting, tile)
- Exempt Minor landscaping and non-structural landscaping walls
- Exempt Fences under 6 feet (Note: Still requires a $50 permit in some contexts, verify with office)
Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building Office before proceeding.
- Plat of Survey
- Architectural plans
- Manual J/ResCheck (for new builds)
- Health Department sign-off (for septic/well)
- Building code
- 2021 IBC, 2021 IRC, 2020 NEC, 2018 Illinois Energy Conservation Code, Current Illinois Plumbing Code
- Permit validity
- Generally 6 months to start work; expires 1 year after issuance if not completed.
- Owner-builder
- Owners may perform work on their own primary residence but must still pull permits and pass inspections.
- Contractor requirements
- Contractors must be licensed with Grundy County ($150 annual fee), provide a $10,000 License and Permit Bond, and liability insurance.
Source: Grundy County Land Use Department (Building Office) ↗
Application process
Typical processing: Approximately 10 business days.
- 01 Complete the General Building Permit Application or project-specific form (Deck, Pool, etc.).
- 02 Submit one set of plans (typically 2 feet by 3 feet) stamped and signed by an Illinois Registered Architect for new homes or major structures.
- 03 Include a Plat of Survey showing all setbacks.
- 04 Provide proof of approved well/septic permits from the Health Department if applicable.
- 05 Submit contractor registration and insurance certificates.
Typical processing time: Approximately 10 business days.
Source: Grundy County Land Use Department (Building Office) ↗
Fee schedule
Grundy County building permit fees
Checks payable to Grundy County Land Use.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 815-941-3228 (at least 24 hours in advance) (phone)
- Scheduling deadline
- Call at least 24 hours in advance.
- Inspection hours
- Monday through Friday during business hours
- Time windows
- Plumbing inspections often restricted to Monday/Thursday afternoons.
Typical sequence: Typical sequence: Footing, Foundation, Rough-in (Electric, Plumbing, Mechanical), Insulation, Final.
Source: Grundy County Land Use Department (Building Office) ↗
Frequently asked
Common questions about unincorporated Grundy County permits
01 Do I need a building permit in unincorporated Grundy County, IL? ▸
02 How much does a building permit cost in unincorporated Grundy County, IL? ▸
03 How do I apply for a building permit in unincorporated Grundy County, IL? ▸
04 How long does it take to get a building permit in unincorporated Grundy County, IL? ▸
05 What work is exempt from building permits in unincorporated Grundy County, IL? ▸
06 How do I schedule a building inspection in unincorporated Grundy County, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Grundy County Land Use Department (Building Office) before applying. Jaspector is not legal advice.