How to apply for a building permit in City of Morris, Illinois. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$100.00
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Morris Building and Zoning Office

Street address
700 N. Division Street, Morris, IL 60450
Coverage
Serves the incorporated City of Morris.
Online portal
City of Morris Building and Zoning
Document Center (PDF downloads)
§ 02

When a permit is required

Permit triggers and exempt work for Morris

New construction, additions, remodeling, decks, fences, sheds, roofing, siding, and sign installation.

Painting, papering, tiling, carpeting
Cabinets, counter tops and similar finish work
Swings and other playground equipment
  • Exempt Painting, papering, tiling, carpeting
  • Exempt Cabinets, counter tops and similar finish work
  • Exempt Swings and other playground equipment

Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building Office before proceeding.

Required documents
  • Plat of Survey
  • Building plans
  • Contractor list
Building code
2021 IBC/IRC (State mandate), 2008 NEC, 2015 NFPA 101, Current Illinois Plumbing Code
Permit validity
1 year from date of issuance.
Owner-builder
Allowed for primary residence work.
Contractor requirements
Contractors must be registered with the city.

Source: City of Morris Building and Zoning Office ↗

§ 03

Application process

Typical processing: Typically 5 to 10 business days for standard reviews.

  1. 01
    Download and complete the appropriate application from the Document Center.
  2. 02
    Submit two sets of plans and a Plat of Survey.
  3. 03
    Pay the required plan review fee and state surcharge.

Typical processing time: Typically 5 to 10 business days for standard reviews.

Source: City of Morris Building and Zoning Office ↗

§ 04

Fee schedule

Morris building permit fees

Fee type
Amount
01
Minimum permit fee
$100.00
02
Plan check fee
50 percent of permit fee for Residential; 65 percent for Commercial.
03
Permit fee formula
Valuation-based using UBC Table 1A.
04
Penalty (no permit)
Penalty of double fee for work started without a permit.

State surcharge is greater of 0.0005 x valuation or $1.00.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 815-942-1855 (phone)
Inspection hours
Monday through Friday during business hours

Typical sequence: Typical sequence: Stake-out, Footing, Foundation, Rough-in, Insulation, Final.

Source: City of Morris Building and Zoning Office ↗

§ 06

Frequently asked

Common questions about Morris permits

01 Do I need a building permit in Morris, IL?
New construction, additions, remodeling, decks, fences, sheds, roofing, siding, and sign installation.
02 How much does a building permit cost in Morris, IL?
Building permit fees in Morris, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $100.00. Fees are calculated as: Valuation-based using UBC Table 1A.. Plan check fee: 50 percent of permit fee for Residential; 65 percent for Commercial..
03 How do I apply for a building permit in Morris, IL?
To apply for a building permit in Morris, IL, follow these steps: 1. Download and complete the appropriate application from the Document Center. 2. Submit two sets of plans and a Plat of Survey. 3. Pay the required plan review fee and state surcharge.
04 How long does it take to get a building permit in Morris, IL?
Building permit processing times in Morris, IL typically run Typically 5 to 10 business days for standard reviews.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Morris, IL?
Not all construction work requires a permit in Morris, IL. The following work is generally exempt: Painting, papering, tiling, carpeting; Cabinets, counter tops and similar finish work; Swings and other playground equipment. Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building Office before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Morris, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Morris, IL via: 815-942-1855.
last verified April 2026 source City of Morris Building and Zoning Office ↗ entry id permits/illinois/grundy/morris

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Morris Building and Zoning Office before applying. Jaspector is not legal advice.