jaspector
City building permits

Village of Shabbona

How to apply for a building permit in Village of Shabbona, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2018 ICC Series (moving to 2021/2025)
Avg processing
1-2 weeks (review is external)
Min. permit fee
$35
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department (Contracted)

Street address
308 E. Comanche Ave, Shabbona, IL 60550
Coverage
Village limits.
§ 02

When a permit is required

Permit triggers and exempt work for Shabbona

New homes, additions, structural alterations, decks, detached garages, in-ground pools.

Sheds <200 sq. ft.
Roof repairs/replacements
Retaining walls <4 feet
Finish work (painting, flooring)
Decks <200 sq. ft. and <30" above grade (detached)
Windows/Doors (replacement same size)
Siding
  • Exempt Sheds <200 sq. ft.
  • Exempt Roof repairs/replacements
  • Exempt Retaining walls <4 feet
  • Exempt Finish work (painting, flooring)
  • Exempt Decks <200 sq. ft. and <30" above grade (detached)
  • Exempt Windows/Doors (replacement same size)
  • Exempt Siding
Required documents
  • Application
  • Plat of Survey
  • 2 sets of plans
Building code
2018 ICC Series (moving to 2021/2025)
Permit validity
6 months to start
Owner-builder
Residential owners may perform work.
Contractor requirements
Registration voluntary but recommended.
§ 03

Application process

Typical processing: 1-2 weeks (review is external)

  1. 01
    Complete permit application from Village website.
  2. 02
    Submit to Village Hall with Plat of Survey and plans.
  3. 03
    Plans sent to B&F Construction Code Services for review.
  4. 04
    Village notifies applicant of approval/fees.
  5. 05
    Pay fee at Village Hall and receive permit.

Typical processing time: 1-2 weeks (review is external)

Source: Building Department (Contracted) ↗

§ 04

Fee schedule

Shabbona building permit fees

Fee type
Amount
01
Minimum permit fee
$35
02
Plan check fee
Included in total package
03
Permit fee formula
Mixed flat fees and inspection costs
04
Reinspection fee
$55+

Check or cash

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 847-428-7010 (phone)
Inspection hours
Scheduled through B&F

Typical sequence: Standard ICC sequence

§ 06

Frequently asked

Common questions about Shabbona permits

01 Do I need a building permit in Shabbona, IL?
New homes, additions, structural alterations, decks, detached garages, in-ground pools.
02 How much does a building permit cost in Shabbona, IL?
Building permit fees in Shabbona, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $35. Fees are calculated as: Mixed flat fees and inspection costs. Plan check fee: Included in total package.
03 How do I apply for a building permit in Shabbona, IL?
To apply for a building permit in Shabbona, IL, follow these steps: 1. Complete permit application from Village website. 2. Submit to Village Hall with Plat of Survey and plans. 3. Plans sent to B&F Construction Code Services for review. 4. Village notifies applicant of approval/fees. 5. Pay fee at Village Hall and receive permit.
04 How long does it take to get a building permit in Shabbona, IL?
Building permit processing times in Shabbona, IL typically run 1-2 weeks (review is external). Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Shabbona, IL?
Not all construction work requires a permit in Shabbona, IL. The following work is generally exempt: Sheds <200 sq. ft.; Roof repairs/replacements; Retaining walls <4 feet; Finish work (painting, flooring); Decks <200 sq. ft. and <30" above grade (detached); Windows/Doors (replacement same size); Siding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Shabbona, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Shabbona, IL via: 847-428-7010.
last verified April 2026 source Building Department (Contracted) ↗ entry id permits/illinois/dekalb/shabbona

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department (Contracted) before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in DeKalb County.

Same county, different permit office. Click for that jurisdiction's full guide.