On this page 6
When a permit is required
Permit triggers and exempt work for Parma
Required for new construction, additions, alterations, repairs, re-roofing, accessory structures over 200 square feet, and any work attached to an existing structure. Electrical, plumbing, and HVAC through DOPL statewide.
- Exempt Structures under 200 square feet not attached to another structure (follows Idaho state/IBC/IRC exemptions)
- Exempt Painting, flooring, cabinet work not involving structural or plumbing changes
- Exempt Agricultural buildings (verify with city for applicability within city limits)
- Exempt Minor repairs following IBC/IRC Section 105.2 exemptions
Note: Thin data - the cityofparma.org website returns 403 errors and limited public information is available online. Contact City Hall directly for complete exemption list.
- Completed application
- Site plan
- Construction drawings
- Building code
- Parma is required by Idaho state law to adopt the Idaho state building codes (2018 IBC/IRC with state amendments). Contact city for local amendments. The 2018 International Codes apply as the state baseline.
- Permit validity
- Not confirmed; contact city.
- Owner-builder
- Idaho state law applies; contact city for local rules.
- Contractor requirements
- Idaho contractor registration required per Idaho Code 54-52.
Application process
Typical processing: Not publicly specified.
- 01 Contact City Hall at (208) 722-5138 to confirm permit requirements for the specific project type.
- 02 Obtain application form from City Hall or potentially through the online portal.
- 03 Submit completed application with required documents and applicable fee.
- 04 Plans reviewed by Building Official (Steve Pierson, Idaho Building Inspection Services, Inc.).
- 05 Permit issued upon approval.
- 06 Post permit on site.
- 07 Schedule inspections through Building Official Steve Pierson (208-440-3861) or through city.
- 08 Final inspection and project closeout.
Typical processing time: Not publicly specified.
Fee schedule
Parma building permit fees
Likely in person at City Hall; contact for current payment methods.
Required inspections
Scheduling and sequence
- Building Official Steve Pierson: (208) 440-3861 or City Hall: (208) 722-5138 (phone)
- Inspection hours
- Not publicly confirmed; contact city.
Typical sequence: Standard IBC/IRC inspection sequence (foundation, rough-in, final). Electrical, plumbing, and HVAC inspected by DOPL.
Frequently asked
Common questions about Parma permits
01 Do I need a building permit in Parma, ID? ▸
02 How much does a building permit cost in Parma, ID? ▸
03 How do I apply for a building permit in Parma, ID? ▸
04 How long does it take to get a building permit in Parma, ID? ▸
05 What work is exempt from building permits in Parma, ID? ▸
06 How do I schedule a building inspection in Parma, ID? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Parma Building Department before applying. Jaspector is not legal advice.