When a permit is required
Permit triggers and exempt work for Centralhatchee
The town publishes permit categories and fees for houses, mobile homes, carports/garages, free-standing manufactured garages, pole barns/barns, porches/decks, accessory buildings, electrical, plumbing, and mechanical work
- Exempt Remodeling work that does not affect structural integrity, alter outside dimensions of a building, require rewiring, or require replumbing
Note: Accessory buildings 120 square feet or less with no electricity are listed as no charge on the fee sheet; the page does not expressly say 'no permit required'
- Building code
- Georgia State Minimum Standard Codes for Construction
- Permit validity
- Building permits are good for one (1) year from the date of purchase
- Owner-builder
- Georgia law allows an owner to act as his or her own contractor for a building intended solely for that owner's occupancy and not offered for sale or lease, subject to the limits in O.C.G.A. 43-41-17(h)
- Contractor requirements
- Georgia requires a residential contractor license where residential contracting work exceeds $2,500
Application process
Application → plan check → issuance → inspection → final
- 01 Review the town's posted building permit information and fee schedule on the Forms, Permits, Bus. Licenses page
- 02 Contact or visit City Hall to obtain and submit the applicable permit paperwork
- 03 Pay the listed permit fee based on the project type
- 04 Post the permit on site in a conspicuous location before inspections
- 05 Call City Hall at (770) 854-5801 to schedule the required inspections
Fee schedule
Centralhatchee building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call City Hall at (770) 854-5801 (phone)
Typical sequence: For dwellings: footing, plumbing under slab, slab prep, foundation, floor framing, electrical rough-in, plumbing rough-in, heating/air rough-in, framing, house wrap, insulation, 30 day temporary electrical, certificate of occupancy. For mobile homes: tie-downs, porches, HVAC connect/disconnect, power pole, certificate of occupancy
Frequently asked
Common questions about Centralhatchee permits
01 Do I need a building permit in Centralhatchee, GA? ▸
02 How much does a building permit cost in Centralhatchee, GA? ▸
03 How do I apply for a building permit in Centralhatchee, GA? ▸
04 What work is exempt from building permits in Centralhatchee, GA? ▸
05 How do I schedule a building inspection in Centralhatchee, GA? ▸