jaspector
City building permits

City of Calhoun

How to apply for a building permit in City of Calhoun, Georgia. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Department of Building Inspection, Community Development

Street address
Department of Building Inspection, 700 W Line St, Calhoun, GA 30701
Coverage
Applies within Calhoun city limits. Calhoun runs its own permit process rather than routing standard building permits through Gordon County.
Online portal
ePlan Solutions
ePlan Solutions
§ 02

When a permit is required

Permit triggers and exempt work for Calhoun

Calhoun publishes a unified all-permits application and separate fee schedules for building, grading, electrical, plumbing, HVAC, fire, and related work, indicating city permits are required for those categories. The city also states all plans must be submitted for review through ePlan Solutions.

Note: No public Calhoun exempt-work list was found on the reviewed official permit pages.

Required documents
  • Permit application
  • Current contractor license
  • Contractor driver's license
  • Current Georgia business license
  • Plans submitted through ePlan Solutions where applicable
Building code
Calhoun's permit page links applicants to the Georgia DCA Standard Building Codes. As a Georgia municipality, Calhoun must enforce the Georgia State Minimum Standard Codes currently in effect.
Contractor requirements
The city expressly requires a current contractor license, contractor driver's license, and current Georgia business license with the application. Georgia state contractor licensing rules also apply.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Download the citywide all-permits application from the Building Inspection page.
  2. 02
    Assemble the application with a copy of the current contractor license, contractor driver's license, and current Georgia business license.
  3. 03
    Send the application and documents by email, mail, or hand delivery to the Department of Building Inspection.
  4. 04
    Submit all plans requiring review through the city's ePlan Solutions portal.
  5. 05
    Pay assessed permit and plan-check fees after review. The city posts its current fee resolution online.
  6. 06
    Coordinate inspections through the Building Inspection Department until the project is approved for occupancy or completion.

Source: Department of Building Inspection, Community Development ↗

§ 04

Fee schedule

Effective 2025-06-16

Fee type
Amount
01
Minimum permit fee
For residential single-family work valued at $1,000 or less, no building permit fee is charged unless inspection is required, in which case the fee is $20 per inspection. For commercial and industrial work valued at $1,000 or less, the inspection fee is $30 per inspection.
02
Plan check fee
30 percent of the building permit fee when valuation exceeds $1,000 and plans are required.
03
Permit fee formula
Valuation-based. Residential valuation is determined at $125.00 times square footage; unfinished residential basements at $31.00 times square footage. Commercial and industrial valuation is determined at $100.00 times square footage. The fee schedule then applies tiered permit-fee brackets.
04
Reinspection fee
Reinspection site revisit $35, second visit same item $45, third visit and up same item $55.
05
Penalty (no permit)
Work without proper permits and/or unlicensed work carries administrative fees ranging from $500 to $1,500 depending on project type and severity. Work begun before permit issuance is subject to doubled permit fees.

The city accepts application packages by email, mail, or in person. No separate public online permit payment portal was identified on the reviewed permit page.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025-06-16) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Coordinate with the Department of Building Inspection using the posted permit-office phone and email after permit issuance. (phone)
Time windows

Typical sequence: The city publicly confirms plan review first, then permit issuance, then inspections. A detailed public sequence by trade or construction stage was not found on the reviewed city pages.

§ 06

Frequently asked

Common questions about Calhoun permits

01 Do I need a building permit in Calhoun, GA?
Calhoun publishes a unified all-permits application and separate fee schedules for building, grading, electrical, plumbing, HVAC, fire, and related work, indicating city permits are required for those categories. The city also states all plans must be submitted for review through ePlan Solutions.
02 How much does a building permit cost in Calhoun, GA?
Building permit fees in Calhoun, GA are set by the local building department and vary by project type and valuation. The minimum permit fee is For residential single-family work valued at $1,000 or less, no building permit fee is charged unless inspection is required, in which case the fee is $20 per inspection. For commercial and industrial work valued at $1,000 or less, the inspection fee is $30 per inspection.. Fees are calculated as: Valuation-based. Residential valuation is determined at $125.00 times square footage; unfinished residential basements at $31.00 times square footage. Commercial and industrial valuation is determined at $100.00 times square footage. The fee schedule then applies tiered permit-fee brackets.. Plan check fee: 30 percent of the building permit fee when valuation exceeds $1,000 and plans are required..
03 How do I apply for a building permit in Calhoun, GA?
To apply for a building permit in Calhoun, GA, follow these steps: 1. Download the citywide all-permits application from the Building Inspection page. 2. Assemble the application with a copy of the current contractor license, contractor driver's license, and current Georgia business license. 3. Send the application and documents by email, mail, or hand delivery to the Department of Building Inspection. 4. Submit all plans requiring review through the city's ePlan Solutions portal. 5. Pay assessed permit and plan-check fees after review. The city posts its current fee resolution online. 6. Coordinate inspections through the Building Inspection Department until the project is approved for occupancy or completion.
04 How do I schedule a building inspection in Calhoun, GA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Calhoun, GA via: Coordinate with the Department of Building Inspection using the posted permit-office phone and email after permit issuance..
last verified April 2026 source Department of Building Inspection, Community Development ↗ entry id permits/georgia/gordon/calhoun

Educational reference. Permit rules and fees change — confirm current requirements directly with Department of Building Inspection, Community Development before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Gordon County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Gordon County jurisdictions →