When a permit is required
Permit triggers and exempt work for Gordon County
Permits may be required for building, renovation, accessory structures, and agricultural structures depending on scope. Typically projects over 120 square feet require a permit.
Note: No public county exempt-work list was found on the reviewed official Gordon County building pages.
- Driveway inspection
- Street address
- Recorded deed and plat
- Septic permit or Environmental Health documentation
- Fire permit for commercial work
- Permit application
- Supporting plans
- Building code
- Gordon County must enforce the Georgia State Minimum Standard Codes. DCA's current code page lists 2024 IBC, 2024 IRC, 2024 IPC, 2024 IMC, 2024 IFGC, 2024 ISPSC, 2023 NEC, and 2015 IECC with Georgia amendments/supplements.
- Permit validity
- Permit becomes null and void if work is not commenced within 180 days of issuance, or if work is suspended or abandoned for 180 days after issuance.
- Owner-builder
- The county posts a Home Owner Build Affidavit.
- Contractor requirements
- The county applications require Georgia state license information for the contractor and trade subcontractors. Georgia state residential and general contractor licensing rules apply.
Application process
Application → plan check → issuance → inspection → final
- 01 Contact Gordon County Building, Planning and Development at 706-629-0505 or visit the office to confirm whether a permit is required for the proposed work.
- 02 Gather prerequisite documents, including driveway inspection and addressing where applicable, recorded deed and plat, septic approval or no-impact documentation, and fire permit for commercial, industrial, and multifamily work.
- 03 Download the applicable permit application from the county building page. Commercial plans are uploaded through the county's ePlan Solutions portal.
- 04 Submit the application package to the Building Inspections Office at 215 N Wall St, 2nd Floor. The county states all permits must undergo plan review before work begins.
- 05 After review, county staff assign valuation and fees and notify the applicant when the permit is ready for payment.
- 06 After payment, begin work and call 706-629-0505 to schedule inspections. When inspections are complete, pick up the Letter of Occupancy if needed.
Source: Building Inspection Department, Gordon County Community Development ↗
Fee schedule
Gordon County building permit fees
The county permit-process page states permit payment occurs after staff complete plan review and fee calculation.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Call the Building Inspections Office at 706-629-0505 after permit issuance. (phone)
- Inspection hours
- Monday through Friday, 8:30 am to 5:00 pm
- Time windows
Typical sequence: The county publicly states permit issuance occurs first, inspections are scheduled after payment, and a Letter of Occupancy may be picked up after all inspections are completed.
Frequently asked
Common questions about unincorporated Gordon County permits
01 Do I need a building permit in unincorporated Gordon County, GA? ▸
02 How much does a building permit cost in unincorporated Gordon County, GA? ▸
03 How do I apply for a building permit in unincorporated Gordon County, GA? ▸
04 How do I schedule a building inspection in unincorporated Gordon County, GA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspection Department, Gordon County Community Development before applying. Jaspector is not legal advice.