jaspector
§ GA Cobb County
County building permits

Unincorporated Cobb County

How to apply for a building permit in unincorporated Cobb County, Georgia. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$250 minimum permit fee
Last verified
April 2026
On this page 6
§ 01

Permit authority

Development and Inspections Division, Community Development, Cobb County

Street address
1150 Powder Springs St, Ste 400, Marietta, GA 30064
Coverage
Applies only in unincorporated Cobb County. Cobb County's pages repeatedly direct users to confirm whether an address lies inside a city before applying.
Online portal
Online Inspections Portal
Online Inspections Portal
§ 02

When a permit is required

Permit triggers and exempt work for Cobb County

The county states construction in unincorporated Cobb must meet building-code requirements for new construction, additions, remodeling, and related work, with residential and commercial checklists for specific project types.

Note: The public FAQ page indicates the county has a specific answer for exempt residential work, but the collapsed public page did not expose the exemption list in the page lines reviewed. Applicants should use the county FAQ and residential checklist pages or call Community Development for scope confirmation before relying on an exemption.

Required documents
  • County application packet
  • Project-specific checklists
  • Plans
  • Any outside approvals required by the project type
  • Residential permitting pages publish separate checklists for pools, accessory structures, additions, basements, demolition, power use, renovations, retaining walls, solar, and more
Building code
Cobb County enforces Georgia state minimum standard construction codes and county-approved code amendments.
Permit validity
The reviewed county pages do not publish a single general permit-expiration rule.
Owner-builder
The county publishes a Homeowner Permit checklist and homeowner application materials.
Contractor requirements
Georgia licensing rules apply. The county also references homeowner-only permit pathways separately from contractor subpermit applications.
§ 03

Application process

Typical processing: No general permit-review turnaround is published on the pages reviewed.

  1. 01
    Confirm the property is in unincorporated Cobb using the county jurisdiction map.
  2. 02
    Choose the applicable residential or commercial checklist and gather the required application packet and documents.
  3. 03
    Calculate permit fees using the county fee schedules.
  4. 04
    Submit the application packet and supporting materials to Community Development.
  5. 05
    County staff reviews the application and issues comments or approval; applicants using HB493 third-party review must designate that choice when applying.
  6. 06
    Pay fees, obtain permit issuance, and schedule required inspections online or by text.

Typical processing time: No general permit-review turnaround is published on the pages reviewed.

Source: Development and Inspections Division, Community Development, Cobb County ↗

§ 04

Fee schedule

Effective July 1, 2024

Fee type
Amount
01
Minimum permit fee
$250 minimum permit fee
02
Plan check fee
Included within the county's updated fee schedules by permit category.
03
Permit fee formula
Updated July 1, 2024 fee schedules use square footage and flat-fee methods. New complete building construction is calculated from ICC Building Valuation Data at $6 per $1,000 of estimated construction cost for one- and two-family construction.
04
Reinspection fee
County inspection and permit schedules publish reinspection and related charges.

Fees are calculated from county fee schedules before permit issuance. Inspection scheduling is online or by text after permitting.

Fees change periodically. Confirm at the official fee schedule ↗ (effective July 1, 2024) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Online or text scheduling available.

Typical sequence: Permit-specific inspection codes are published for building, electrical, plumbing, HVAC, zoning, pool location, arborist, and site inspections.

§ 06

Frequently asked

Common questions about unincorporated Cobb County permits

01 Do I need a building permit in unincorporated Cobb County, GA?
The county states construction in unincorporated Cobb must meet building-code requirements for new construction, additions, remodeling, and related work, with residential and commercial checklists for specific project types.
02 How much does a building permit cost in unincorporated Cobb County, GA?
Building permit fees in unincorporated Cobb County, GA are set by the local building department and vary by project type and valuation. The minimum permit fee is $250 minimum permit fee. Fees are calculated as: Updated July 1, 2024 fee schedules use square footage and flat-fee methods. New complete building construction is calculated from ICC Building Valuation Data at $6 per $1,000 of estimated construction cost for one- and two-family construction.. Plan check fee: Included within the county's updated fee schedules by permit category..
03 How do I apply for a building permit in unincorporated Cobb County, GA?
To apply for a building permit in unincorporated Cobb County, GA, follow these steps: 1. Confirm the property is in unincorporated Cobb using the county jurisdiction map. 2. Choose the applicable residential or commercial checklist and gather the required application packet and documents. 3. Calculate permit fees using the county fee schedules. 4. Submit the application packet and supporting materials to Community Development. 5. County staff reviews the application and issues comments or approval; applicants using HB493 third-party review must designate that choice when applying. 6. Pay fees, obtain permit issuance, and schedule required inspections online or by text.
04 How long does it take to get a building permit in unincorporated Cobb County, GA?
Building permit processing times in unincorporated Cobb County, GA typically run No general permit-review turnaround is published on the pages reviewed.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in unincorporated Cobb County, GA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in unincorporated Cobb County, GA via: Online Inspections Portal, Text to 877-376-1455. Online or text scheduling available..
last verified April 2026 source Development and Inspections Division, Community Development, Cobb County ↗ entry id permits/georgia/cobb/unincorporated

Educational reference. Permit rules and fees change — confirm current requirements directly with Development and Inspections Division, Community Development, Cobb County before applying. Jaspector is not legal advice.