When a permit is required
Permit triggers and exempt work for Smyrna
New homes, decks, reroofs, windows, interior remodels, additions, accessory structures over 200 square feet or over one story for residential work, retaining walls, pools, solar, generators, projects involving two or more licensed trades, structural and interior demolition, mechanical replacements, tree removals of 24 inches or larger, and land disturbance.
Note: No standalone public exempt-work list was located on the reviewed Smyrna pages. The city publishes detailed permit-required lists and directs applicants to use the portal or call when in doubt.
- Building permit application in the portal
- Supplemental plans
- Documents and licenses as required by permit type
- Building code
- Smyrna follows the current Georgia state minimum standard construction codes adopted by DCA and enforces them through local administrative procedures. Code changes effective January 1, 2026.
- Permit validity
- Building permits are valid for six months if there is no activity.
- Owner-builder
- A homeowner may obtain a building permit only if the property is the homeowner's current permanent residence and is in the homeowner's legal name. A landlord may not do rental-house work unless Georgia-licensed.
- Contractor requirements
- The city ensures contractors are properly licensed and permitted. Georgia state contractor licensing rules apply.
Application process
Typical processing: Residential plan review typically 5 to 10 business days; commercial typically 2 to 3 weeks; land disturbance typically 4 to 5 weeks.
- 01 Create an account in the Smyrna online portal.
- 02 Select the permit type and upload all plans, licenses, and supporting documents required for that scope.
- 03 Submit through the portal; in-person submittals are not accepted.
- 04 The city performs plan review, routing to other departments as needed.
- 05 Pay permit fees in the portal.
- 06 After issuance, schedule inspections in the same portal and obtain CO or completion documents after finals.
Typical processing time: Residential plan review typically 5 to 10 business days; commercial typically 2 to 3 weeks; land disturbance typically 4 to 5 weeks.
Source: Building Division, Community Development, City of Smyrna ↗
Fee schedule
Smyrna building permit fees
Fees are paid through the OpenGov portal. Separate water, sewer, and fire fees may apply through other offices.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- OpenGov Portal (online)
- Scheduling deadline
- Requests received by 4:00 PM are scheduled for the next business day; requests after 4:00 PM or on weekends are scheduled two business days out.
Typical sequence: Required inspections are identified during plan review and listed on the permit. Final inspections lead to CO or certificate of completion depending on project type.
Frequently asked
Common questions about Smyrna permits
01 Do I need a building permit in Smyrna, GA? ▸
02 How much does a building permit cost in Smyrna, GA? ▸
03 How do I apply for a building permit in Smyrna, GA? ▸
04 How long does it take to get a building permit in Smyrna, GA? ▸
05 How do I schedule a building inspection in Smyrna, GA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division, Community Development, City of Smyrna before applying. Jaspector is not legal advice.