When a permit is required
Permit triggers and exempt work for Union County
A building permit is required for all construction in unincorporated Union County.
- Survey and legal description
- 911 address
- Proof of payment of special assessment tax
- Septic permit or letter, or sewer and water tap-in receipt
- FDOT culvert permit or no-permit letter if applicable
- Flood data letter
- Flood elevation materials if in a flood zone
- Subcontractor verification form
- Owner-builder disclosure if claiming exemption
- Recorded deed if recently purchased
- Two sets of construction plans
- Recorded Notice of Commencement
- Receipt for payment of fees
- Posted 911 address numbers
- Building code
- 2023 Florida Building Code, 8th Edition, effective December 31, 2023.
- Permit validity
- Permits remain valid according to Florida Statutes 553.792.
- Owner-builder
- Owner-builders must sign and submit a required owner-builder disclosure statement when claiming the exemption.
- Contractor requirements
- All contractors and subcontractors must be licensed with the State of Florida and approved by Union County Building Department before permit issuance.
Application process
Typical processing: Processing times vary; check with Union County Building Department for current timelines.
- 01 Confirm the parcel is in unincorporated Union County and not inside Lake Butler, Raiford, or Worthington Springs.
- 02 Obtain a 911 address.
- 03 Assemble the county checklist items, including survey and legal description, utility or septic documentation, flood data letter, construction plans, subcontractor verification, and recorded Notice of Commencement when required.
- 04 Submit the application through Cloudpermit or coordinate with the Building Department using county application forms.
- 05 Respond to plan review comments, pay fees, and receive permit issuance before starting work.
- 06 Schedule inspections through Cloudpermit and obtain final approval.
Typical processing time: Processing times vary; check with Union County Building Department for current timelines.
Required inspections
Scheduling and sequence
Frequently asked
Common questions about unincorporated Union County permits
01 Do I need a building permit in unincorporated Union County, FL? ▸
02 How do I apply for a building permit in unincorporated Union County, FL? ▸
03 How long does it take to get a building permit in unincorporated Union County, FL? ▸
04 How do I schedule a building inspection in unincorporated Union County, FL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Union County Building Department before applying. Jaspector is not legal advice.