How to apply for a building permit in Town of Raiford, Florida. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Union County Building Department (for permit issuance); Town of Raiford (for flood/compliance)

Street address
15 NE 1st Street, Lake Butler, FL 32054 (Union County Building Department)
Coverage
All properties within the Town of Raiford limits. Building permits are issued by Union County; the Town of Raiford provides municipal flood/compliance letters.
Online portal
Cloudpermit
Cloudpermit
§ 02

When a permit is required

Permit triggers and exempt work for Raiford

A building permit is required for all construction within the Town of Raiford.

Required documents
  • Survey and legal description
  • 911 address
  • Municipal flood data or compliance letter from Town of Raiford
  • Utility or septic documentation
  • Subcontractor verification form
  • Construction plans (two sets)
  • Recorded Notice of Commencement (when required)
  • Posted address numbers
  • Additional trade-specific documents as applicable
Building code
2023 Florida Building Code, 8th Edition, effective December 31, 2023.
Permit validity
Permits remain valid according to Florida Statutes 553.792.
Owner-builder
Owner-builders must sign and submit a required owner-builder disclosure statement when claiming the exemption.
Contractor requirements
All contractors and subcontractors must be licensed with the State of Florida and approved by Union County Building Department before permit issuance.
§ 03

Application process

Typical processing: Processing times vary; check with Union County Building Department for current timelines.

  1. 01
    Confirm the parcel is inside Raiford town limits.
  2. 02
    Obtain the municipal flood data or compliance letter from the Town of Raiford before county permit issuance.
  3. 03
    Complete the applicable Union County permit application and checklist items.
  4. 04
    Submit the permit through Union County Building Department / Cloudpermit.
  5. 05
    Respond to review comments, pay applicable fees, and schedule inspections through the county process.

Typical processing time: Processing times vary; check with Union County Building Department for current timelines.

Source: Union County Building Department (for permit issuance); Town of Raiford (for flood/compliance) ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: Building inspections are handled through Union County Cloudpermit and Union County building staff, based on the county-issued permit process.

Source: Union County Building Department (for permit issuance); Town of Raiford (for flood/compliance) ↗

§ 05

Frequently asked

Common questions about Raiford permits

01 Do I need a building permit in Raiford, FL?
A building permit is required for all construction within the Town of Raiford.
02 How do I apply for a building permit in Raiford, FL?
To apply for a building permit in Raiford, FL, follow these steps: 1. Confirm the parcel is inside Raiford town limits. 2. Obtain the municipal flood data or compliance letter from the Town of Raiford before county permit issuance. 3. Complete the applicable Union County permit application and checklist items. 4. Submit the permit through Union County Building Department / Cloudpermit. 5. Respond to review comments, pay applicable fees, and schedule inspections through the county process.
03 How long does it take to get a building permit in Raiford, FL?
Building permit processing times in Raiford, FL typically run Processing times vary; check with Union County Building Department for current timelines.. Timelines can vary based on project complexity and current department workload.
04 How do I schedule a building inspection in Raiford, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Raiford, FL via: Cloudpermit portal.

Educational reference. Permit rules and fees change — confirm current requirements directly with Union County Building Department (for permit issuance); Town of Raiford (for flood/compliance) before applying. Jaspector is not legal advice.