How to apply for a building permit in City of Treasure Island, Florida. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Florida Building Code, 8th Edition (2023)
Min. permit fee
Varies by permit type
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Division

Street address
10451 Gulf Blvd, Treasure Island, FL 33706
Coverage
All properties within the City of Treasure Island.
§ 02

When a permit is required

Permit triggers and exempt work for Treasure Island

Building permits required for all construction projects in the City of Treasure Island.

Note: Confirm exemptions with Building Division before proceeding.

Required documents
  • Completed permit application
  • Notarized owner signature (or approved alternative)
  • Notarized contractor signature (or approved alternative)
  • Construction plans and specifications
  • Site plan with property dimensions
Building code
Florida Building Code, 8th Edition (2023)
Permit validity
Permits must be issued and work commenced within specified timeframe. Permits and notices of commencement must be posted on site.
Owner-builder
Owner-builders may apply; contact Building Division for requirements.
Contractor requirements
Contractors must be licensed by the State of Florida.

Source: Building Division ↗

§ 03

Application process

Typical processing: 2-4 weeks after completeness depending on project scope.

  1. 01
    Register for OPPS/EnerGov online system - this is the fastest submission path.
  2. 02
    Create permit application with project details.
  3. 03
    Upload complete application packet with notarized owner and contractor signatures (or approved alternatives).
  4. 04
    Submit plans and supporting documents.
  5. 05
    Pay application and review fees.
  6. 06
    Building Division reviews for code compliance.
  7. 07
    Address correction comments if required.
  8. 08
    Obtain permit issuance and post notice of commencement on site if required.

Typical processing time: 2-4 weeks after completeness depending on project scope.

Source: Building Division ↗

§ 04

Fee schedule

Effective Current as of 2026-03

Fee type
Amount
01
Minimum permit fee
Varies by permit type
02
Plan check fee
Percentage of permit fee
03
Permit fee formula
Based on project valuation and permit category
04
Trade permit fee
Per trade
05
Reinspection fee
Assessed for failed inspections

Payment through OPPS/EnerGov system

Fees change periodically. Confirm at the official fee schedule ↗ (effective Current as of 2026-03) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Per city procedures
Inspection hours
Monday-Friday during business hours
Time windows
City inspection windows

Typical sequence: Building Division oversees plan review, permitting, inspections, and issuance of Certificates of Occupancy or Completion.

Contact Building Division for remote inspection policies.

Source: Building Division ↗

§ 06

Frequently asked

Common questions about Treasure Island permits

01 Do I need a building permit in Treasure Island, FL?
Building permits required for all construction projects in the City of Treasure Island.
02 How much does a building permit cost in Treasure Island, FL?
Building permit fees in Treasure Island, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is Varies by permit type. Fees are calculated as: Based on project valuation and permit category. Plan check fee: Percentage of permit fee.
03 How do I apply for a building permit in Treasure Island, FL?
To apply for a building permit in Treasure Island, FL, follow these steps: 1. Register for OPPS/EnerGov online system - this is the fastest submission path. 2. Create permit application with project details. 3. Upload complete application packet with notarized owner and contractor signatures (or approved alternatives). 4. Submit plans and supporting documents. 5. Pay application and review fees. 6. Building Division reviews for code compliance. 7. Address correction comments if required. 8. Obtain permit issuance and post notice of commencement on site if required.
04 How long does it take to get a building permit in Treasure Island, FL?
Building permit processing times in Treasure Island, FL typically run 2-4 weeks after completeness depending on project scope.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Treasure Island, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Treasure Island, FL via: OPPS/EnerGov system. Per city procedures.
last verified April 2026 source Building Division ↗ entry id permits/florida/pinellas/treasure-island

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division before applying. Jaspector is not legal advice.