jaspector
City building permits

City of Madeira Beach

How to apply for a building permit in City of Madeira Beach, Florida. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Florida Building Code, 8th Edition (2023)
Avg processing
Varies by permit type and complexity.
Min. permit fee
Varies by permit type
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
300 Municipal Drive, Madeira Beach, FL 33708
Coverage
All properties within the City of Madeira Beach.
§ 02

When a permit is required

Permit triggers and exempt work for Madeira Beach

Permits required before erecting, demolishing, constructing, repairing, or structurally altering buildings or changing use. Specific permit types include: new construction, additions, interior alterations, pools, roofing, fences, signs, garages, sheds, driveways, sidewalks, and trade work.

Note: Confirm exemptions with Building Department before proceeding.

Required documents
  • Completed permit application
  • Construction plans and specifications
  • Site plan with property dimensions
  • Property survey
  • Flood zone documentation where applicable
Building code
Florida Building Code, 8th Edition (2023)
Permit validity
Permits remain valid while work progresses; contact city for expiration policies.
Owner-builder
Owner-builders may apply; contact Building Department for requirements.
Contractor requirements
Contractors must be licensed by the State of Florida.

Source: Building Department ↗

§ 03

Application process

Typical processing: Varies by permit type and complexity.

  1. 01
    Access City of Madeira Beach online permit system.
  2. 02
    Create permit application with project details.
  3. 03
    Upload required documents including plans and certifications.
  4. 04
    Pay application and review fees.
  5. 05
    Building Department reviews for code compliance.
  6. 06
    Address correction comments if required.
  7. 07
    Obtain permit issuance and schedule inspections.

Typical processing time: Varies by permit type and complexity.

Source: Building Department ↗

§ 04

Fee schedule

Effective Current as of 2026-03

Fee type
Amount
01
Minimum permit fee
Varies by permit type
02
Plan check fee
Included in permit fee
03
Permit fee formula
Based on project valuation and permit category
04
Trade permit fee
Per trade
05
Reinspection fee
Assessed for failed inspections

Payment through online portal or city channels

Fees change periodically. Confirm at the official fee schedule ↗ (effective Current as of 2026-03) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Online permit system or city process (online)
Scheduling deadline
Per city procedures
Inspection hours
Monday-Friday during business hours
Time windows
All phases of construction

Typical sequence: Building Official performs inspections through all phases of construction and final inspection before occupancy.

Contact Building Department for remote inspection policies.

Source: Building Department ↗

§ 06

Frequently asked

Common questions about Madeira Beach permits

01 Do I need a building permit in Madeira Beach, FL?
Permits required before erecting, demolishing, constructing, repairing, or structurally altering buildings or changing use. Specific permit types include: new construction, additions, interior alterations, pools, roofing, fences, signs, garages, sheds, driveways, sidewalks, and trade work.
02 How much does a building permit cost in Madeira Beach, FL?
Building permit fees in Madeira Beach, FL are set by the local building department and vary by project type and valuation. The minimum permit fee is Varies by permit type. Fees are calculated as: Based on project valuation and permit category. Plan check fee: Included in permit fee.
03 How do I apply for a building permit in Madeira Beach, FL?
To apply for a building permit in Madeira Beach, FL, follow these steps: 1. Access City of Madeira Beach online permit system. 2. Create permit application with project details. 3. Upload required documents including plans and certifications. 4. Pay application and review fees. 5. Building Department reviews for code compliance. 6. Address correction comments if required. 7. Obtain permit issuance and schedule inspections.
04 How long does it take to get a building permit in Madeira Beach, FL?
Building permit processing times in Madeira Beach, FL typically run Varies by permit type and complexity.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Madeira Beach, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Madeira Beach, FL via: Online permit system or city process. Per city procedures.
last verified April 2026 source Building Department ↗ entry id permits/florida/pinellas/madeira-beach

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.