On this page 6
When a permit is required
Permit triggers and exempt work for Indian River County
A permit shall be obtained before doing work or construction of any character when a permit is required, including replacement items such as fences, roofs, and HVAC systems.
- Exempt Painting, papering, tiling, carpeting and similar finish work
- Exempt Certain small above-ground prefabricated pools
- Exempt Some playground equipment
- Exempt Specified minor electrical repairs
Note: Permit exemptions do not authorize work that violates other laws. Other state, county, or agency permits may still be required.
- Permit application
- Plans and construction documents
- Project valuation
- Contractor registration and information
- Subcontractor affidavits where applicable
- Trade-specific forms and checklists
- Building code
- 2023 Florida Building Code, 8th Edition, effective December 31, 2023. Wind speed maps effective December 31, 2023.
- Owner-builder
- Florida owner-builder rules apply; homeowner exemption from contractor licensing does not eliminate the need to obtain permits and pay fees.
- Contractor requirements
- State certified contractors must exhibit their state certificate to the local Building Official; local licensing and registration materials are published by the county.
Application process
Typical processing: Processing times vary by project complexity. MGO and paper processes are accepted.
- 01 Confirm the parcel is in unincorporated Indian River County and not inside Sebastian, Fellsmere, Indian River Shores, Orchid, or Vero Beach city limits.
- 02 Review county permit forms, checklists, and wind speed map resources before filing.
- 03 File through MGO, or use the county's allowed paper or email process where applicable.
- 04 Submit plans, valuation, contractor information, and any project-specific affidavits or outside-agency approvals.
- 05 Record a Notice of Commencement when Florida law requires it.
- 06 Respond to review comments, pay fees, and obtain issuance before work starts.
- 07 Schedule inspections through MGO and obtain final approval or certificate as applicable.
Typical processing time: Processing times vary by project complexity. MGO and paper processes are accepted.
Fee schedule
Indian River County building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- MGO portal (online)
- 772-226-1260 (phone)
Typical sequence: MGO supports inspection scheduling, permit status review, reports, and inspector schedule access.
Frequently asked
Common questions about unincorporated Indian River County permits
01 Do I need a building permit in unincorporated Indian River County, FL? ▸
02 How much does a building permit cost in unincorporated Indian River County, FL? ▸
03 How do I apply for a building permit in unincorporated Indian River County, FL? ▸
04 How long does it take to get a building permit in unincorporated Indian River County, FL? ▸
05 What work is exempt from building permits in unincorporated Indian River County, FL? ▸
06 How do I schedule a building inspection in unincorporated Indian River County, FL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Indian River County Building Division before applying. Jaspector is not legal advice.