City building permits

City of Middletown

How to apply for a building permit in City of Middletown, Connecticut. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Division

Street address
245 deKoven Drive, 2nd Floor, Middletown, CT 06457
Coverage
City permit authority for Middletown properties; building is housed within Public Works and coordinates with planning and other city reviewers.
Online portal
City-hosted online building permit system
City-hosted online building permit system
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Middletown

New construction, renovations, alterations, remodeling, demolition, and related building or trade work; city also posts a separate handout for work exempt from permits.

City posts a separate "Work exempt from permits" handout on the Building Division page.
  • Exempt City posts a separate "Work exempt from permits" handout on the Building Division page.
Required documents
  • Permit application
  • plans where required
  • payment
  • CT Form 7A or 7B where applicable
  • and permit-specific checklists.
Building code
Connecticut State Building Code enforced by the city.
Owner-builder
CT Form 7B is posted on the department page
Contractor requirements
City expects contractor information and uses CT Form 7A when someone else pulls the permit for the contractor
§ 03

Application process

Typical processing: Inspection scheduling runs 7 to 10 days out, and sometimes 2 or more weeks in summer

  1. 01
    Download or complete the permit application through the Building Division page or online system.
  2. 02
    Submit plans, required paperwork, and payment; projects needing plans are not reviewed until drawings and paperwork are received.
  3. 03
    If applying on behalf of a contractor, include CT Form 7A as required by the city.
  4. 04
    Wait for permit issuance; permits must be fully paid and issued before inspections can be scheduled.
  5. 05
    Call the office to schedule inspections directly with staff.

Typical processing time: Inspection scheduling runs 7 to 10 days out, and sometimes 2 or more weeks in summer

Source: Building Division ↗

§ 04

Fee schedule

Effective 2026-03

Fee type
Amount
01
Minimum permit fee
See UPDATED Permit Fees handout on department page
02
Plan check fee
See department fee handout and plan review checklist
03
Permit fee formula
Posted in the UPDATED Permit Fees handout
04
Reinspection fee
$75 after two failed inspections of the same portion of the job, due before a third reinspection is scheduled

Payment must be received before review and before inspection scheduling

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026-03) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 860-638-4870 (phone)
Inspection hours
Office hours Monday through Friday, 7:00 a.m. to 4:30 p.m.

Typical sequence: Permit issuance, required progress inspections, final inspection, then CO where applicable

$75 reinspection fee after two failures of the same work segment

§ 06

Frequently asked

Common questions about Middletown permits

01 Do I need a building permit in Middletown, CT?
New construction, renovations, alterations, remodeling, demolition, and related building or trade work; city also posts a separate handout for work exempt from permits.
02 How much does a building permit cost in Middletown, CT?
Building permit fees in Middletown, CT are set by the local building department and vary by project type and valuation. The minimum permit fee is See UPDATED Permit Fees handout on department page. Fees are calculated as: Posted in the UPDATED Permit Fees handout. Plan check fee: See department fee handout and plan review checklist.
03 How do I apply for a building permit in Middletown, CT?
To apply for a building permit in Middletown, CT, follow these steps: 1. Download or complete the permit application through the Building Division page or online system. 2. Submit plans, required paperwork, and payment; projects needing plans are not reviewed until drawings and paperwork are received. 3. If applying on behalf of a contractor, include CT Form 7A as required by the city. 4. Wait for permit issuance; permits must be fully paid and issued before inspections can be scheduled. 5. Call the office to schedule inspections directly with staff.
04 How long does it take to get a building permit in Middletown, CT?
Building permit processing times in Middletown, CT typically run Inspection scheduling runs 7 to 10 days out, and sometimes 2 or more weeks in summer. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Middletown, CT?
Not all construction work requires a permit in Middletown, CT. The following work is generally exempt: City posts a separate "Work exempt from permits" handout on the Building Division page.. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Middletown, CT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Middletown, CT via: 860-638-4870.
last verified April 2026 source Building Division ↗ entry id permits/connecticut/middlesex/middletown

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division before applying. Jaspector is not legal advice.