On this page 5
When a permit is required
Permit triggers and exempt work for Durham
Building and zoning permit types handled through the Building and Land Use Department portal.
- Exempt No public exempt-work list located in the reviewed town materials.
- Online application
- plans
- and supporting materials required by permit type.
- Building code
- Connecticut State Building Code enforced locally.
Application process
Typical processing: Not posted
- 01 Use the PermitLink portal linked from the town site.
- 02 Select the needed building or land use permit and complete the online form.
- 03 Upload plans and supporting documentation.
- 04 Pay fees and await municipal review.
- 05 Schedule inspections and close out permit after approvals.
Typical processing time: Not posted
Required inspections
Scheduling and sequence
- Through the Durham PermitLink and department workflow (phone)
Typical sequence: Permit issuance, required inspections, final approval
Frequently asked
Common questions about Durham permits
01 Do I need a building permit in Durham, CT? ▸
02 How do I apply for a building permit in Durham, CT? ▸
03 How long does it take to get a building permit in Durham, CT? ▸
04 What work is exempt from building permits in Durham, CT? ▸
05 How do I schedule a building inspection in Durham, CT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Land Use Department before applying. Jaspector is not legal advice.