jaspector
City building permits

City of Sheridan

How to apply for a building permit in City of Sheridan, Colorado. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Building Department

Street address
4101 S. Federal Boulevard, Sheridan, CO 80110
Coverage
Applies inside Sheridan city limits.
Online portal
Tyler EnerGov Self Service
Tyler EnerGov Self Service / electronic plan review portal
§ 02

When a permit is required

Permit triggers and exempt work for Sheridan

Construction cannot start without a valid building permit. Public Sheridan guidance expressly includes footings, fencing, and caissons as examples requiring permits.

Required documents
  • Project-specific applications, plans, and supporting materials
  • Special-inspector reports
  • Stormwater documentation
  • Surveys
  • Approved plans on site
Building code
2021 IBC, IRC, IFC, IECC, IEBC, IPC, IMC, and 2020 NEC
Owner-builder
Sheridan publishes an 'Applying for a Permit as a Homeowner' resource for owner-occupants of single-family detached homes.
Contractor requirements
All contractors must be licensed or registered with Sheridan before starting work. State-licensed trades must still register with the city. Electrical permits are pulled from the State of Colorado.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Determine whether the job qualifies as an over-the-counter permit or a full plan-review permit.
  2. 02
    For plan-review permits, create an online account and upload application documents through Sheridan's electronic portal.
  3. 03
    For OTC items, use the posted application forms and submit/pay as directed by the city.
  4. 04
    City reviews the submittal and issues comments or approval.
  5. 05
    Pay applicable permit and plan review fees.
  6. 06
    Permit card and approved plans must be posted or available on site before inspections.

Source: Building Department ↗

§ 04

Fee schedule

Sheridan building permit fees

Fee type
Amount
01
Plan check fee
Included in the city fee schedule, but the exact formula was not clearly readable from the reviewed materials.
02
Permit fee formula
Sheridan publishes a fee schedule and also links a new-construction building cost estimator; valuation-based pricing appears to be used for building permits.
03
Reinspection fee
Reinspection fees must be paid before additional inspections when assessed.
04
Penalty (no permit)
Work started without a permit triggers an investigation fee that doubles the permit fee.

Payment timing depends on OTC versus plan-review path; public materials direct applicants through city permit resources and the portal.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
8:00 a.m. to 4:30 p.m.

Typical sequence: Sheridan's public permit pages reference foundation, stormwater, rough, and final-stage inspections depending on project type.

Source: Building Department ↗

§ 06

Frequently asked

Common questions about Sheridan permits

01 Do I need a building permit in Sheridan, CO?
Construction cannot start without a valid building permit. Public Sheridan guidance expressly includes footings, fencing, and caissons as examples requiring permits.
02 How much does a building permit cost in Sheridan, CO?
Building permit fees in Sheridan, CO are set by the local building department and vary by project type and valuation. Fees are calculated as: Sheridan publishes a fee schedule and also links a new-construction building cost estimator; valuation-based pricing appears to be used for building permits.. Plan check fee: Included in the city fee schedule, but the exact formula was not clearly readable from the reviewed materials..
03 How do I apply for a building permit in Sheridan, CO?
To apply for a building permit in Sheridan, CO, follow these steps: 1. Determine whether the job qualifies as an over-the-counter permit or a full plan-review permit. 2. For plan-review permits, create an online account and upload application documents through Sheridan's electronic portal. 3. For OTC items, use the posted application forms and submit/pay as directed by the city. 4. City reviews the submittal and issues comments or approval. 5. Pay applicable permit and plan review fees. 6. Permit card and approved plans must be posted or available on site before inspections.
04 How do I schedule a building inspection in Sheridan, CO?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Sheridan, CO via: City permit process portal.
last verified April 2026 source Building Department ↗ entry id permits/colorado/arapahoe/sheridan

Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.