When a permit is required
Permit triggers and exempt work for Littleton
Required to construct, enlarge, alter, repair, move, demolish, or change occupancy of a building or structure, or to install/alter/replace electrical, gas, mechanical, or plumbing systems. All fences and decks require a permit.
Note: No Littleton-specific exemption list was clearly published on the reviewed pages. Permit triggers are described broadly; confirm any claimed exemption directly with the Permit Center.
- Varies by permit type
- Building Guides and Requirements
- Project PDFs
- Building code
- 2024 IBC, IECC, IEBC, IFGC, IMC, IPC, IPMC, IRC, ISPSC, IWUIC; 2023 NEC; 2021 IFC; ICC A117.1-2017
- Permit validity
- Permit must be commenced within 180 days; it expires 365 days after issuance regardless of activity unless extended by the Building Official. Extensions may be granted in writing for periods up to 180 days each.
- Owner-builder
- Homeowner permits are limited to owner-occupied residential property. Homeowners doing one discipline do not need to be a general contractor but must submit a Homeowner Affidavit. For projects involving two or more disciplines, the homeowner must hire a city-licensed general contractor or demonstrate sufficient knowledge through ICC testing.
- Contractor requirements
- All contractors working in Littleton must be licensed with the city. Plumbing and electrical applicants must provide proof of active Colorado master/journeyman and contractor licensing as applicable.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm the property is inside Littleton city limits.
- 02 Submit the permit through eTRAKiT and upload required documents.
- 03 Email the permit team after uploading documents so staff can process the record.
- 04 City reviews the submittal and requests any corrections or added materials.
- 05 Pay assessed permit, review, and tax charges.
- 06 Permit is issued in eTRAKiT; inspections are then scheduled through the same portal.
Source: Building Permit Center / City of Littleton Building Division ↗
Fee schedule
Littleton building permit fees
Building permits are assessed and collected at permit issuance; eTRAKiT is the authorized online payment method.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- eTRAKiT portal (online)
- After-hours: 303-795-3751 (phone)
- Scheduling deadline
- Requests submitted by 4:00 p.m. Monday-Friday are generally scheduled for the next business day.
- Time windows
- Inspections may book out a few business days during peak periods. After-hours means before 7:30 a.m., after 4:30 p.m., weekends, and holidays.
Typical sequence: Example published by the city is rough plumbing, rough electric, and rough heating before rough framing, then later-stage approvals and final.
Source: Building Permit Center / City of Littleton Building Division ↗
Frequently asked
Common questions about Littleton permits
01 Do I need a building permit in Littleton, CO? ▸
02 How much does a building permit cost in Littleton, CO? ▸
03 How do I apply for a building permit in Littleton, CO? ▸
04 How do I schedule a building inspection in Littleton, CO? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Permit Center / City of Littleton Building Division before applying. Jaspector is not legal advice.