When a permit is required
Permit triggers and exempt work for Bennett
Bennett lists quick permits, general building permits, fence permits, sign permits, infrastructure and utility permits, street and concrete infrastructure permits, and ROW or access permits in its online system.
Note: Bennett provides a 'Do I need a permit?' handout on its permit page. The handout itself was referenced but not fully reproduced on the main page, so exemption specifics should be checked directly with the Building Department before relying on an exemption.
- Online application
- PDF plans
- Permit-specific supporting documents
- Additional plan-review materials as requested by staff
- Building code
- Bennett states all permits issued on the 2018 code cycle before July 1, 2026 may finish on that approved cycle, indicating a move to a new adopted code cycle after that date; verify exact current edition when filing.
- Owner-builder
- Bennett publishes a homeowner permit information sheet and owner contact guidance.
- Contractor requirements
- Bennett's portal also handles contractor licensing; town pages reference contractor classes and require corresponding trade registration or licensing where subcontract trades are performed.
Application process
Application → plan check → issuance → inspection → final
- 01 Create a portal account; existing contractors email Bennett for an access code to connect prior licenses and permits.
- 02 Choose the appropriate permit type in the portal.
- 03 Upload PDF plan-review documents; Bennett states the Building Department only accepts PDF format for plan review.
- 04 Submit the application and monitor portal status for additional information requests and plan-review fees.
- 05 Pay required fees as the application is reviewed and approved.
- 06 Once issued, obtain the permit and inspection cards from the Building Department and keep them available on site.
Fee schedule
Bennett building permit fees
Final fees are not determined until a complete permit application has been submitted and reviewed by town staff.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Portal (online)
- Building Department email (email)
- Inspection hours
- Chief Building Official drop-in hours are generally Tuesday 12:00 p.m. to 1:00 p.m. at Town Hall when in season; the town also allows scheduled in-person meetings by email.
Typical sequence: Permit issuance, permit card and approved plans on site, staged inspections, correction items as needed, then final approval.
Frequently asked
Common questions about Bennett permits
01 Do I need a building permit in Bennett, CO? ▸
02 How much does a building permit cost in Bennett, CO? ▸
03 How do I apply for a building permit in Bennett, CO? ▸
04 How do I schedule a building inspection in Bennett, CO? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Bennett Building Department before applying. Jaspector is not legal advice.