City of Dixon

How to apply for a building permit in City of Dixon, California. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development Department, Building Division, City of Dixon

Street address
600 East A Street, Dixon, CA 95620
Coverage
Applies to City of Dixon building permits for residential and non-residential work within city limits.
Online portal
Dixon Civic Access
Tyler Enterprise Permitting and Licensing
§ 02

When a permit is required

Permit triggers and exempt work for Dixon

The city directs applicants to permit-specific submittal documents and checklists rather than a single public list of covered work.

Small detached accessory structures up to 120 square feet
Sidewalks and drives up to 30 inches above grade
Fences up to 7 feet high
Simple finish work such as paint, paper, tile, cabinets, and countertops
Certain small temporary tents and other narrow code carve-outs
  • Exempt Small detached accessory structures up to 120 square feet
  • Exempt Sidewalks and drives up to 30 inches above grade
  • Exempt Fences up to 7 feet high
  • Exempt Simple finish work such as paint, paper, tile, cabinets, and countertops
  • Exempt Certain small temporary tents and other narrow code carve-outs

Note: Maintenance-only and emergency repair exceptions exist in multiple code sections, and emergency electrical or plumbing repairs often require permit filing within short periods. Check each applicable code section and local permit guidance before starting work.

Required documents
  • Complete permit submittal package
  • Permit-type attachments
  • One consolidated plan set PDF
  • Owner-builder or contractor-required forms
  • Owner or contractor license verification for contractors
Building code
2022 California Building Standards Code with local amendments
Permit validity
No explicit day limit is stated in the accessible permit handouts, but the city provides an Extension Request form for issued permits.
Owner-builder
Owners must certify awareness of liability, provide identification or authorization, and acknowledge labor-law and tax obligations if they hire workers.
Contractor requirements
Contractors must hold an active City of Dixon business license and an active California contractor license.

Source: Community Development Department, Building Division, City of Dixon ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Register for a Dixon Civic Access account.
  2. 02
    Choose the permit type and prepare a complete first submittal package with required documents and supported file types.
  3. 03
    Upload a single consolidated plan PDF and any permit-specific attachments.
  4. 04
    Submit the application as a complete submittal because incomplete packages are rejected.
  5. 05
    Pay applicable plan-check fees at submission because review does not start without payment.
  6. 06
    Respond to electronic plan review comments and submit revisions through the portal.
  7. 07
    If filing as owner-builder, submit the Owner-Builder Acknowledgement form.
  8. 08
    After approval, request inspections through Dixon Civic Access or the inspection line.

Source: Community Development Department, Building Division, City of Dixon ↗

§ 04

Fee schedule

Dixon building permit fees

Fee type
Amount
01
Plan check fee
Required for applicable permits and usually paid at submission.
02
Permit fee formula
Fees are updated annually and are based on the application date of a complete submittal.
03
Reinspection fee
Reinspection fees may apply after repeated not-ready inspections and may need to be paid before re-calling the inspection.

Payment options include cards through the portal, mailed check, or in-person cash or card. Credit card transactions are capped at $5,000.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
Published inspection information states inspections occur from 8:00 AM to 2:30 PM and not on Wednesdays. A December 2025 update also states Monday through Thursday, 8:00 AM to 3:30 PM.

Typical sequence: The required inspection sequence is listed on the job inspection card and varies by project scope.

Source: Community Development Department, Building Division, City of Dixon ↗

§ 06

Frequently asked

Common questions about Dixon permits

01 Do I need a building permit in Dixon, CA?
The city directs applicants to permit-specific submittal documents and checklists rather than a single public list of covered work.
02 How much does a building permit cost in Dixon, CA?
Building permit fees in Dixon, CA are set by the local building department and vary by project type and valuation. Fees are calculated as: Fees are updated annually and are based on the application date of a complete submittal.. Plan check fee: Required for applicable permits and usually paid at submission..
03 How do I apply for a building permit in Dixon, CA?
To apply for a building permit in Dixon, CA, follow these steps: 1. Register for a Dixon Civic Access account. 2. Choose the permit type and prepare a complete first submittal package with required documents and supported file types. 3. Upload a single consolidated plan PDF and any permit-specific attachments. 4. Submit the application as a complete submittal because incomplete packages are rejected. 5. Pay applicable plan-check fees at submission because review does not start without payment. 6. Respond to electronic plan review comments and submit revisions through the portal. 7. If filing as owner-builder, submit the Owner-Builder Acknowledgement form. 8. After approval, request inspections through Dixon Civic Access or the inspection line.
04 What work is exempt from building permits in Dixon, CA?
Not all construction work requires a permit in Dixon, CA. The following work is generally exempt: Small detached accessory structures up to 120 square feet; Sidewalks and drives up to 30 inches above grade; Fences up to 7 feet high; Simple finish work such as paint, paper, tile, cabinets, and countertops; Certain small temporary tents and other narrow code carve-outs. Note: Maintenance-only and emergency repair exceptions exist in multiple code sections, and emergency electrical or plumbing repairs often require permit filing within short periods. Check each applicable code section and local permit guidance before starting work. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Dixon, CA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Dixon, CA via: Dixon Civic Access, (707) 678-7005.
last verified April 2026 source Community Development Department, Building Division, City of Dixon ↗ entry id permits/california/solano/dixon

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department, Building Division, City of Dixon before applying. Jaspector is not legal advice.