On this page 6
When a permit is required
Permit triggers and exempt work for Pacifica
- Construction, alteration, moving, demolition, reroofing, electrical/plumbing/heating installations, roof changes, swimming pool work, and generally any physical change to property structures. - Also required before building, altering, repair, installation of regulated systems, and any occupancy change. - Source: https://www.cityofpacifica.org/home/showpublisheddocument/774/637828565644630000
Note: - No permit does not mean other zoning/development rules are waived. - Some exempt items still may require review of plans, zoning, encroachments, or private utility/utility-right-of-way permits.
- - Job details: project valuation, area, short description, contacts. - Building permit application in portal steps (4-step submission flow). - Plans/docs uploaded as required
- permit emails are sent from donotreply@csgengr.com. - Source: https://www.cityofpacifica.org/home/showpublisheddocument/780/638888864564200000
- https://www.cityofpacifica.org/departments/community-development/building-division
- Building code
- - 2025 California Building Code, Residential Code, Electrical Code, Plumbing Code, Mechanical Code, Energy Code, CALGreen, Wildland-Urban Interface Code (effective Jan. 1, 2026), plus local amendments in Pacifica Municipal Code Title 8. - Source: https://www.cityofpacifica.org/departments/community-development/building-division
- Permit validity
- - Not published on the Building Division overview or linked fee schedule pages accessed here. Confirm on issued permit/notice documents or in current building code sections.
- Owner-builder
- - Not explicitly stated in the Building Division landing material; the city provides design-professional requirements instead.
- Contractor requirements
- - Design must be by a licensed architect/engineer for certain structural, occupancy, and system types; unlicensed designs are limited to narrow low-risk categories (small wood-frame SFH/4-plex classes, nonstructural nonseismic work, etc.). - Source: https://www.cityofpacifica.org/home/showpublisheddocument/790/637828565691330000
Application process
Application → plan check → issuance → inspection → final
- 01 Open the Building Division permit portal and choose to apply for a new permit.
- 02 In the new project flow, create an account (or create permit without registration) and complete Job Info/Project Info (project address, permit type, valuation, square footage, brief description).
- 03 Enter contact information and owner email/phone.
- 04 Upload required files (PDF preferred; project plans can be submitted in one combined set when required).
- 05 Submit the application and pay plan check and other required fees before review.
- 06 City review: first review ~3�4 weeks; resubmittals ~2�3 weeks each; final agency coordination up to ~1 week.
- 07 Permit status and next steps are provided through the permit account.
Fee schedule
Pacifica building permit fees
- Pay plan check before review via permit account. - In-person payment can be made by card or check at 1800 Francisco Blvd; card payment is subject to 3% service fee. - Checks to: City of Pacifica, Building Division, 170 Santa Maria Ave., Pacifica, CA 94044.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (650) 737-1000 (phone)
- Scheduling deadline
- - Call Building Inspection Hotline: (650) 737-1000. - Permit office notes also mention inspection phone requests with weekday daytime window and 24-hour advance notice.
- Inspection hours
- - Building Division office hours: Mon 8:30-12:30, Tue 13:30-17:00, Wed 8:30-12:30 and 13:30-19:00, Thu 8:30-12:30. - Inspections cannot be requested more than one week in advance.
Typical sequence: - Footing/foundation, underground plumbing, floor joists/insulation, framing, exterior lath, sheetrock, then final. - Electrical/plumbing/mechanical inspections at intermediate stages before concealment.
Frequently asked
Common questions about Pacifica permits
01 Do I need a building permit in Pacifica, CA? ▸
02 How much does a building permit cost in Pacifica, CA? ▸
03 How do I apply for a building permit in Pacifica, CA? ▸
04 How do I schedule a building inspection in Pacifica, CA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division, City of Pacifica before applying. Jaspector is not legal advice.