When a permit is required
Permit triggers and exempt work for Atherton
- Most building-related work on private property requires permit and separate planning/building applications by structure; separate permits are required for detached structures, demolition, grading/drainage, photovoltaic systems, landscape screening, and similar items. - Structures above 6 inches above grade generally need review; some small structures are specifically exempt (see Exempt Work). - Required documents at permit submittal: - Signed Building Permit Application form, and signed construction documents/plans (design professional signatures required on plans, studies, calculations). - Owner/builder disclosure when owner-builder is used; signed and returned before permit issuance. - Contractor information and licenses, plus worker compensation insurance data. - Required agency approvals and utility/impact notices where applicable (e.g., fire district, CalWater, school fees, BAAQMD demolition letter).
- Exempt - One-story detached tool/storage sheds up to 120 sf (may still require other approvals). - Fences (with height/location limits). - Small retaining walls, certain small tanks, sidewalks/driveways within thresholds. - Decks not exceeding 200 sf and limited height conditions. - Limited electrical/ mechanical/ plumbing minor repair categories and simple finish work. - Other items listed in Town’s "Work Exempt from Building Permit Requirements" handout.
Note: - Exempt from building permit does not mean exempt from Planning/Public Works or other agencies. - Many exempt-style jobs can still trigger planning, right-of-way, tree, or utility reviews. - Any permit requirements may still apply in right-of-way, encroachment, or heritage-tree situations.
- Building code
- - Building Department references Title 24/California Building Code and Atherton Municipal Code. - Official Enforced Building Codes are 2022 California codes for applications on/after January 1, 2023.
- Permit validity
- - Building permit applications expire after 180 days unless a one-time 180-day written extension is approved. - Reactivation and other expiration items are listed in the master fee schedule.
- Owner-builder
- - Town requires completion and return of Owner-Builder Disclosure and Authorization form before permit issuance; owner verification (driver’s license/notarization or equivalent) is required.
- Contractor requirements
- - A Town of Atherton business license is required for the primary contractor before permit issuance; subcontractor list required before final inspection.
Application process
Typical processing: No posted standard intake-to-review timeline is visible on the town’s permit pages.
- 01 Prepare a complete building permit application package (signed plans, calculations, studies, and owner/contractor information).
- 02 For new submissions use the Building Department new/online ePlan link; existing permit holders use the existing case link.
- 03 At plan check submittal time, include complete Building Permit Application + Square Footage Worksheet + complete plan set and required specialist documents.
- 04 Submit required contractor/license/approval materials and any required permits before issuance; plan check comments are not released until fees are paid.
- 05 If submitted plans are incomplete, they may be returned for re-submittal.
- 06 If permitted work needs correction, use revision/deferred submittal process and include signed revised documents.
Typical processing time: No posted standard intake-to-review timeline is visible on the town’s permit pages.
Fee schedule
Atherton building permit fees
- No credit cards accepted; payment can be made in person or by mail. - Plan check comments and approvals are released only after required fees are paid.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (650) 752-0542 (phone)
- 650-752-0561 (phone)
- Scheduling deadline
- - Provide permit number(s), address, inspection request description, requester name, and job-site phone. - Keep approved plans/job card and person present at site. - Lead-time rule: requests before 2:00 PM on prior business day are usually scheduled for next day. - Final inspections may require landscape screening/grading-drainage/encroachment/Menlo Park Fire and subcontractor-list sign-offs.
- Time windows
- - Morning inspections: 8:00 AM–12:00 PM. - Afternoon inspections: approx. 1:00 PM–4:00 PM. - Permit Center staff intake: 8:00 AM–11:00 AM and 1:00 PM–4:00 PM.
Typical sequence: - Provide permit number(s), address, inspection request description, requester name, and job-site phone. - Keep approved plans/job card and person present at site. - Lead-time rule: requests before 2:00 PM on prior business day are usually scheduled for next day. - Final inspections may require landscape screening/grading-drainage/encroachment/Menlo Park Fire and subcontractor-list sign-offs.
Frequently asked
Common questions about Atherton permits
01 Do I need a building permit in Atherton, CA? ▸
02 How much does a building permit cost in Atherton, CA? ▸
03 How do I apply for a building permit in Atherton, CA? ▸
04 How long does it take to get a building permit in Atherton, CA? ▸
05 What work is exempt from building permits in Atherton, CA? ▸
06 How do I schedule a building inspection in Atherton, CA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Atherton Building Department before applying. Jaspector is not legal advice.