jaspector
§ CA Kings County
City building permits

City of Lemoore

How to apply for a building permit in City of Lemoore, California. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Lemoore Community Development Department, Building Division

Street address
711 W Cinnamon Drive, Lemoore, CA 93245
Coverage
Handles building permits within the incorporated City of Lemoore. Work outside city limits is generally handled by Kings County; some city projects also require outside-agency clearance such as Kings County Health Department clearance or San Joaquin Valley Air Pollution Control District demolition release when applicable.
Online portal
Tyler EnerGov Self Service
Tyler EnerGov Self Service
§ 02

When a permit is required

Permit triggers and exempt work for Lemoore

The city says approvals are required for new structures and for installation or replacement of items including patios, storage buildings, carports, air-conditioning replacements, and reroofing. Most construction requiring plan review must be submitted electronically.

Note: Minor work categories exempt from permit are governed primarily by the adopted California Building Standards Code, but the City of Lemoore permit pages reviewed do not publish a local exemption handout. Because the city publicly highlights that permits are required for many routine items such as patios, storage buildings, carports, HVAC replacements, and reroofing, applicants should not assume residential accessory or replacement work is exempt. Confirm exemption status with the Building Division before starting work, especially for structural, mechanical, electrical, plumbing, reroof, patio, and accessory-structure work.

Required documents
  • Completed City Building Permit Application
  • Project valuation
  • Scaled plans
  • Structural calculations as applicable
  • Title 24 calculations as applicable
  • Truss engineering as applicable
  • Grading plans as applicable
  • Fire sprinkler plans as applicable
  • Soils report or compaction tests as applicable
  • Landscape plans as applicable
  • Demolition permit release as applicable
  • Kings County Health Department clearance as applicable
Building code
City Council adopted the 2022 California Building Standards Code effective January 1, 2023. The Building Division page says the city is working under the 2022 California Building, Plumbing, Mechanical, and National Electrical Code, with 2025 code updates effective January 1, 2025.
Owner-builder
Lemoore uses an owner-builder verification form. The city warns that the owner-builder is the responsible party of record and states the permit will not be issued until the verification is returned.
Contractor requirements
The city's owner-builder notice states contractors must be licensed and bonded, must have a city and or county business license, and must place their license number on permit applications.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm the project with the Building Division before starting work; the city states approvals are needed for new structures and also common projects such as patios, storage buildings, carports, HVAC replacements, and reroofing.
  2. 02
    Create or log into the EnerGov portal and start the permit application online.
  3. 03
    Upload the required application materials. The city's plan-check sheet says plan submittals are electronic in PDF form and require a completed permit application, project valuation, and plans or calculations appropriate to the project scope.
  4. 04
    Provide any specialty documents that apply, such as Title 24 documentation, truss engineering, grading plans, demolition release from the San Joaquin Valley Air Pollution Control District, or Kings County Health Department clearance.
  5. 05
    If applying as an owner-builder, return the owner-builder verification; the city's form says the permit will not be issued until that verification is returned.
  6. 06
    Pay the applicable permit and plan-check fees. For project-specific permits, the current fee schedule states a $75 prepayment is required with application.
  7. 07
    After permit issuance, schedule inspections through the portal or by email at permits@lemoore.com for portal-issued permits. Requests received by 4:30 p.m. are scheduled for the following business day.
  8. 08
    Complete required inspections and obtain final approval.

Source: City of Lemoore Community Development Department, Building Division ↗

§ 04

Fee schedule

Lemoore building permit fees

Fee type
Amount
01
Minimum permit fee
$140 minimum for residential remodels and additions; $1,300 minimum for certain new multifamily, commercial, industrial, and warehouse building permit categories listed in the schedule; project-specific permits vary by type.
02
Plan check fee
65% of building permit fee.
03
Permit fee formula
Mixed structure. General building permits are largely square-foot-based; project-specific permits are flat-fee; plumbing, electrical, and mechanical permits use issuance fees plus unit-fee schedules.
04
Reinspection fee
$161.71 proposed in the current fee schedule PDF
05
Penalty (no permit)
Work done without required permitting is listed as permit fees doubled.

Project-specific permits require a $75 prepayment with application. The fee schedule also lists additional plan review fees, after-hours inspection fees, and actual-cost charges for outside consultants where used.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Scheduling deadline
Requests must be received by 4:30 p.m. for the following business day.
Inspection hours
Building inspection services Monday through Friday, 9:00 a.m. to 4:30 p.m.

Typical sequence: Varies by permit scope. City inspection activity reports show common inspection milestones including foundation, rough electrical, rough frame, rough mechanical, rough plumbing, roof nailing, shear wall, insulation, smoke or carbon monoxide, and final inspection.

Source: City of Lemoore Community Development Department, Building Division ↗

§ 06

Frequently asked

Common questions about Lemoore permits

01 Do I need a building permit in Lemoore, CA?
The city says approvals are required for new structures and for installation or replacement of items including patios, storage buildings, carports, air-conditioning replacements, and reroofing. Most construction requiring plan review must be submitted electronically.
02 How much does a building permit cost in Lemoore, CA?
Building permit fees in Lemoore, CA are set by the local building department and vary by project type and valuation. The minimum permit fee is $140 minimum for residential remodels and additions; $1,300 minimum for certain new multifamily, commercial, industrial, and warehouse building permit categories listed in the schedule; project-specific permits vary by type.. Fees are calculated as: Mixed structure. General building permits are largely square-foot-based; project-specific permits are flat-fee; plumbing, electrical, and mechanical permits use issuance fees plus unit-fee schedules.. Plan check fee: 65% of building permit fee..
03 How do I apply for a building permit in Lemoore, CA?
To apply for a building permit in Lemoore, CA, follow these steps: 1. Confirm the project with the Building Division before starting work; the city states approvals are needed for new structures and also common projects such as patios, storage buildings, carports, HVAC replacements, and reroofing. 2. Create or log into the EnerGov portal and start the permit application online. 3. Upload the required application materials. The city's plan-check sheet says plan submittals are electronic in PDF form and require a completed permit application, project valuation, and plans or calculations appropriate to the project scope. 4. Provide any specialty documents that apply, such as Title 24 documentation, truss engineering, grading plans, demolition release from the San Joaquin Valley Air Pollution Control District, or Kings County Health Department clearance. 5. If applying as an owner-builder, return the owner-builder verification; the city's form says the permit will not be issued until that verification is returned. 6. Pay the applicable permit and plan-check fees. For project-specific permits, the current fee schedule states a $75 prepayment is required with application. 7. After permit issuance, schedule inspections through the portal or by email at permits@lemoore.com for portal-issued permits. Requests received by 4:30 p.m. are scheduled for the following business day. 8. Complete required inspections and obtain final approval.
04 How do I schedule a building inspection in Lemoore, CA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Lemoore, CA via: Tyler EnerGov Self Service, permits@lemoore.com, (559) 924-6744 ext. 732. Requests must be received by 4:30 p.m. for the following business day..
last verified April 2026 source City of Lemoore Community Development Department, Building Division ↗ entry id permits/california/kings/lemoore

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Lemoore Community Development Department, Building Division before applying. Jaspector is not legal advice.