When a permit is required
Permit triggers and exempt work for Decatur
Building permits required for building and construction work; city also routes building inspection requests, occupancy applications, sign permits, tent certification, and related matters through Building Department
- Plot plan stamped by Alabama registered land surveyor
- Residential framing plans and elevations
- Commercial and industrial design documents by registered design professionals where required
- Floodplain documentation where applicable
- Final survey for new construction CO issuance
- Building code
- Currently adopted building code for the City of Decatur (exact list not visible on reviewed page excerpt; consult Municode reference and adopted-code materials)
- Contractor requirements
- Decatur directs applicants to contractor licensing section of Building Department materials and requires registered design professionals for larger or specified commercial work
Application process
Typical processing: Plan review turn-around time depends on volume of reviews and thoroughness of submittal documents
- 01 Register in the CityView Portal if applying online.
- 02 Prepare required survey and plan documents. Decatur requires a plot plan stamped by an Alabama registered land surveyor to be submitted before permit issuance.
- 03 For new residential construction, submit framing plans and elevations for review and approval. For new commercial and industrial work, submit design documents prepared by registered design professionals where required.
- 04 Submit the permit application and supporting materials through CityView or the Building Department.
- 05 Complete city review for zoning, floodplain, code, and plan-review requirements. Plan review turnaround depends on review volume and submittal thoroughness.
- 06 Pay permit and issuance fees, complete inspections, and obtain final inspection approval and certificate of occupancy where applicable.
Typical processing time: Plan review turn-around time depends on volume of reviews and thoroughness of submittal documents
Source: Building Department ↗
Fee schedule
Decatur building permit fees
CityView is the published online portal for registration and online permits
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
Typical sequence: Final building inspection required before certificate of occupancy; for new construction, final building inspection must pass and final survey must be submitted to Building Department
Source: Building Department ↗
Frequently asked
Common questions about Decatur permits
01 Do I need a building permit in Decatur, AL? ▸
02 How much does a building permit cost in Decatur, AL? ▸
03 How do I apply for a building permit in Decatur, AL? ▸
04 How long does it take to get a building permit in Decatur, AL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.