§ Chapter 25 IRC 2021

Plumbing Administration

9 entries from Chapter 25 of IRC 2021, organized by section number. Each entry covers what the code requires, why it exists, what inspectors look for, and common mistakes.

§ 01   Sections

All 9 entries.

Sorted by section number. Click any row for the full entry — answer, requirements, edition diff, related sections.

A Plumbing Permit Is Usually Required Before New Plumbing Work Starts
P2501.1
Do I need a permit to replace or add plumbing in my house?
→
Plumbing Materials Must Be Approved for Their Use
P2501.1
Can I use any pipe or fitting that fits my plumbing project?
→
Final Plumbing Inspection Confirms Fixture Operation
P2503.1
What does the final plumbing inspection check?
→
Plumbing Work Must Be Ready and Accessible for Inspection
P2503.1
Can an inspector approve plumbing if the walls are already closed?
→
Rough Plumbing Must Be Inspected Before It Is Covered
P2503.1
When should I call for a rough-in plumbing inspection?
→
Drain, Waste, and Vent Piping Must Pass a Code Test
P2503.2
Does my DWV piping need a water or air test before inspection?
→
Building Sewer Work Needs Inspection Before Backfill
P2503.3
Does a new sewer line have to be inspected before I backfill the trench?
→
Water Supply Piping Must Be Pressure Tested Before Concealment
P2503.4
Does new water supply piping need a pressure test?
→
Shower Pan Liners Need a Flood Test Before Tile
P2503.6
Does a shower pan liner need to be inspected before tile is installed?
→