City Building Permits

Ojai, CA Building Permit Guide

How to apply for a building permit in Ojai, California. Permit authority, application steps, fees, and inspection requirements.

California Ventura County Updated March 2026

Permit Authority

These requirements apply within Ojai city limits.

Department
Building and Safety Division, Community Development, City of Ojai
Address
401 South Ventura Street, Ojai, CA 93023
Phone
805-646-5581

Online Permit Portal

Platform: GeoCivix / City public portal (ACCELA) • Account required: Yes • Submission: In-person only

Application Process

  1. Call or visit City Hall and set up an in-person appointment with a Building and Planning Technician to present a complete application package for concurrent zoning and building review when required.
  2. Submit a complete application and supporting documents, including the signed application, plans, fees, and related forms.
  3. Pay required permit and review fees based on the current Council-adopted fee schedule.
  4. If the application is incomplete, the Building Official issues a correction notice and the corrected package is reviewed for approval.
  5. Complete final review, inspections, final inspection or certificate of occupancy, and utility connection clearance.
  6. Submit updated permit application materials for revisions or additional work where applicable.

Typical processing time: No citywide published standard processing time was found for regular building permits. Building & Safety documents confirm expedited review for small rooftop solar, but not a general permit timeline.

Source: Building and Safety Division, Community Development, City of Ojai

General Requirements

City fee categories and permit workflow indicate permits are used for new construction, additions, tenant improvements, residential remodels, and combined mechanical, electrical, and plumbing work.

Required Documents

  • Completed building permit application with project description, owner and occupancy information, drawings, and valuation fields
  • Site and plan set requirements including plot plan and project plans with title block, parcel number, and setback information
  • Owner or representative authorization and signatures where applicable
  • Zoning clearance application when zoning review is required
  • Other required permits or clearances such as tree, utility, drainage, or inspection forms as applicable
Permit validity
Building permits expire at 180 days and may be extended per City code. The permit holder must request an extension before expiration, with extensions tied to progress milestones.
Building code
City of Ojai Building Code, Title 9, adopting and amending California building-related codes.
Owner-builder
Owner-builder processing is allowed under conditions. Owner-builder acknowledgment and verification is required, including license, employee-status declarations, and liability notices.
Contractor requirements
Owners and owner-hired contractors must comply with Contractor State License Law, and City business-license rules require current licenses for general contractors and subcontractors. Subcontractors should be listed before permit processing and final inspection.

Fees

Minimum permit fee
No single universal minimum is stated. The published table includes a $103 permit issuance fee for applicable permit classes.
Plan check fee
Included in the permit and plan-review fee structure in the Building & Safety tables.
Permit fee formula
Permit valuation appears based on occupancy-group and building-type tables, valuation tables, fee-per-square-foot thresholds, and percentage add-ons for combined systems.
Reinspection fee
$155 per inspection for missed or excess re-inspection
Penalty (no permit)
Penalty for work without a permit or beyond permit scope is 100% of the permit fee, or 2x fees as referenced in City form language, or staff time, whichever is greater.
Payment note
Fees are paid to the City, and supplemental review agency fees can apply in addition to base permit fees.

Fees change. Verify current amounts at the official fee schedule.

Work That Does NOT Require a Permit

Contact the Building and Safety Division, Community Development, City of Ojai to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • 24-hour inspection request line: 805-653-2238 (phone)
  • Window scheduling: 805-646-5581 ext 112 (phone)
Inspection hours
Inspections conducted Monday-Thursday, 10:00 AM-5:00 PM; no Friday inspections

Typical inspection sequence: Typical process is permit issuance and staged plan review, work between required inspection milestones, final inspection before occupancy approval, and utility connection clearance after final approval.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building and Safety Division, Community Development, City of Ojai before applying.

Need help with your project?

Navigating permits in Ojai can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.

Other cities in Ventura County

View all Ventura County jurisdictions →