City Building Permits
Suisun City, CA Building Permit Guide
How to apply for a building permit in Suisun City, California. Permit authority, application steps, fees, and inspection requirements.
Permit Authority
Municipal permit administration for property within Suisun City boundaries.
- Department
- Building Department, City of Suisun City
- Address
- City Hall, 701 Civic Center Blvd., Suisun City, CA 94585
- Phone
- Building Division: (707) 421-7317; City Hall: (707) 421-7300
Online Permit Portal
Platform: Tyler Self Service • Account required: Yes • Submission: Online only
Additional resources:
Application Process
- Contact the Building Division before starting alterations or construction.
- Submit a building permit application through the permit application portal.
- Upload the application and required plans or drawings, including plot plan, foundation plan, framing, floor plan, elevations, and energy documents.
- Building Division reviews the submittal, and Planning Division may also review the project for zoning compliance.
- After permit issuance, schedule and pass required inspections in sequence.
- Submit revisions for additional plan review and inspection as needed.
General Requirements
Before starting alterations to a home, business, or property, applicants are directed to consult the Building Division and submit listed building work for approval.
Required Documents
- Building Permit Application
- Electronic drawings to scale
- Plot plan
- Foundation details
- Framing details
- Floor plan
- Elevation drawings
- Smoke detector and mechanical, plumbing, or electrical layout details
- Title 24 energy compliance materials
- Building code
- 2025 Title 24 building standards as adopted in Suisun City Municipal Code Title 15
Fees
- Plan check fee
- $130 per hour, one-hour minimum, for additional plan review.
- Permit fee formula
- Primarily itemized service and work fees with hourly review and inspection rates.
- Reinspection fee
- $130 per hour
- Payment note
- Fees are paid through city invoicing tied to permit processing.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
Contact the Building Department, City of Suisun City to confirm whether your project requires a permit before starting work.
Inspections
How to Schedule
- Tyler Self Service Portal (online)
- (707) 421-7319 (phone)
- Inspection hours
- Monday 9:00 AM-12:00 PM and 1:00 PM-5:00 PM, Wednesday same hours, Tuesday and Thursday by appointment, Friday through Sunday closed.
Typical inspection sequence: Typical sequence includes foundation, underfloor, underfloor insulation, shear nailing, frame, insulation, sheetrock nailing, and final inspection.
Additional Resources
- Building code: 2025 Title 24 building standards as adopted in Suisun City Municipal Code Title 15
- Zoning information: View zoning info
- Building Permit Requirements Handout
- Master Fee Schedule Including Fire Prevention Fees
- Building Standards Code Adoption Summary
- License lookup guide: California Contractor License Requirements
- Contract template: California Homeowner-Contractor Agreement
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Department, City of Suisun City before applying.
Need help with your project?
Navigating permits in Suisun City can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Solano County
View all Solano County jurisdictions →